| Assessment Year | 1995 |
|---|---|
| Principal Product | material handling products |
| NAICS |
n/a
|
| SIC | 3535: Conveyors and Conveying Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 200 |
| Plant Area |
30,000
ft2
|
| Annual Production | 13,000
pieces
|
| Production Hrs. Annual | 2,470
hrs
|
| Location (State) | Indiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $84,918 | 912,075 |
kWh
|
$0.093 |
| Natural Gas | $16,471 | 2,835 |
MMBtu
|
$5.81 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $24,384 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $1,674 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Liquid (non-haz) Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $874 | $850 |
$874
9,379
kWh
|
- | - | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $800 | $600 |
$800
8,792
kWh
|
- | - | |
| 03 | 2.6218: Turn off equipment when not in use | $800 | $2,000 |
$800
8,499
kWh
|
- | - | |
| 04 | 2.6218: Turn off equipment when not in use | $797 | $650 |
$797
8,499
kWh
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $771 | $495 |
$771
8,206
kWh
|
- | - | |
| 06 | 2.4133: Use most efficient type of electric motors | $689 | $5,050 |
$689
7,327
kWh
|
- | - | |
| 07 | 2.2437: Recover waste heat from equipment | $609 | $500 | - |
$609
-
MMBtu
|
- | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $357 | $375 |
$357
3,810
kWh
|
- | - | |
| 09 | 2.7444: Close holes and openings in building such as broken windows | $201 | $180 | - |
$201
-
MMBtu
|
- | |
| 10 | 3.1191: Change procedures / equipment / operating conditions | $18,486 | $2,200 | - | - |
$18,486
-
gal
|
|
| TOTAL RECOMMENDED | $24,384 | $12,900 |
$5,088
54,512
kWh
|
$810
-
MMBtu
|
$18,486
-
gal
|
||
| TOTAL IMPLEMENTED | $1,674 | $1,450 |
$1,674
18,171
kWh
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs