Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

281

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Minerals and earths, ground or otherwise treated
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT0927 #06 Y:2019 Use solar heat to make electricty $62,369 $548,847
GT0927 #05 Y:2019 Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $308,141 $1,725,000
GT0927 #04 Y:2019 Insulate bare equipment $5,352 $6,398
GT0927 #03 Y:2019 Utilize higher efficiency lamps and/or ballasts $35,382 $27,983
GT0927 #02 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $7,930 $2,500
GT0927 #01 Y:2019 Install occupancy sensors $32,534 $4,145
SU0463 #06 Y:2018 Use adjustable frequency drive or multiple speed motors on existing system $3,345 $14,020
SU0463 #05 Y:2018 Use waste heat from hot flue gases to preheat $3,314 $8,600
SU0463 #04 Y:2018 Install compressor air intakes in coolest locations $1,966 $4,800
SU0463 #03 Y:2018 Use or replace with energy efficient substitutes $29,334 $68,970
SU0463 #02 Y:2018 Utilize higher efficiency lamps and/or ballasts $27,444 $22,334
SU0463 #01 Y:2018 Install occupancy sensors $3,799 $2,040
UU0134 #05 Y:2018 Keep doors and windows shut when not on use $1,549 -
UU0134 #04 Y:2018 Utilize higher efficiency lamps and/or ballasts $2,606 $2,052
UU0134 #03 Y:2018 Use heat in flue gases to preheat products or materials $8,796 $22,888
UU0134 #02 Y:2018 Improve combustion control capability $19,372 $15,000
UU0134 #01 Y:2018 Add equipment/ operators to reduce production bottleneck $599,971 $264,049
LE0435 #05 Y:2017 Use / purchase optimum sized compressor $5,092 $23,000
LE0435 #04 Y:2017 Re-use or recycle hot or cold process exhaust air $18,948 $76,000
LE0435 #03 Y:2017 Replace existing hvac unit with high efficiency model $1,249 $3,100