ITAC Assessment: UU0310
ITAC logo
ITAC Assessment: UU0310
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Crude Talc Ore
NAICS 212399: All Other Nonmetallic Mineral Mining
SIC 1499: Miscellaneous Nonmetallic Minerals, Except Fuels
Sales Range $50
M
to 100
M
# of Employees 38
Plant Area 85,290,000
ft2
Annual Production 202,000
units
Production Hrs. Annual 2,080
hrs
Location (State) Montana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,960 682,743
kWh
LPG $23,170 1,058
MMBtu
Fuel Oil #1 $1,219,030 56,600
MMBtu
Other Energy $62,900 2,310
MMBtu
TOTAL YEARLY COSTS $1,354,060
RECOMMENDED SAVINGS* $210,168 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Fuel Oil #1 Savings Personnel Changes Savings
01 4.126: Install sensors to detect defects $192,988 $1,006,000 $(-15,012.0)
(-209,373)
kWh
- - $208,000
02 2.9114: Use solar heat to make electricty $15,980 $200,000 - - $15,980
-
MMBtu
-
03 2.2437: Recover waste heat from equipment $850 $3,540 $130
1,850
kWh
$720
-
MMBtu
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $350 $800 $350
4,800
kWh
- - -
TOTAL RECOMMENDED $210,168 $1,210,340 $(-14,532.0)
(-202,723)
kWh
$720
-
MMBtu
$15,980
-
MMBtu
$208,000
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs