Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

174

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Cut stone and stone products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
CC0048 #06 Y:2025 Use solar heat to make electricty $36,494 $215,901
CC0048 #05 Y:2025 Reduce the pressure of compressed air to the minimum required $873 -
CC0048 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $621 $1,000
CC0048 #03 Y:2025 Use / purchase optimum sized compressor $1,356 $5,000
CC0048 #02 Y:2025 Reduce illumination to minimum necessary levels $2,607 $53
CC0048 #01 Y:2025 Utilize higher efficiency lamps and/or ballasts $6,577 $13,513
GT0922 #05 Y:2019 Pay bills on time to avoid late fees $281 $1,190
GT0922 #04 Y:2019 Use adjustable frequency drive or multiple speed motors on existing system $76,284 $79,761
GT0922 #03 Y:2019 Reduce the pressure of compressed air to the minimum required $9,604 $3,500
GT0922 #02 Y:2019 Insulate bare equipment $6,827 $1,175
GT0922 #01 Y:2019 Provide proper maintenance of motor driven equipment $8,082 $1,200
UU0133 #06 Y:2018 Install occupancy sensors $2,849 $1,155
UU0133 #05 Y:2018 Utilize higher efficiency lamps and/or ballasts $5,767 $5,679
UU0133 #04 Y:2018 Reduce the pressure of compressed air to the minimum required $15,825 -
UU0133 #03 Y:2018 Use heat in flue gases to preheat products or materials $30,169 $97,680
UU0133 #02 Y:2018 Use power during off-peak periods $206,416 $1,600
UU0133 #01 Y:2018 Utilize controls to operate equipment only when needed $473,255 $175,000
TT0182 #10 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $836 $600
TT0182 #09 Y:2016 Install timers and/or thermostats $1,612 $500
TT0182 #08 Y:2016 Eliminate or reduce compressed air usage $1,822 $1,500