Assessment Year | 2018 |
---|---|
Principal Product | Limestone |
NAICS | 327410: Lime Manufacturing |
SIC | 3281: Cut Stone and Stone Products |
Sales Range | $50 M to 100M |
# of Employees | 72 |
Plant Area |
12,000
ft2
|
Annual Production | 698,000
ton
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,477,529 | 45,444,000 |
kWh
|
$0.033 |
Electricity Demand | $502,320 | 46,748 |
kW-mo/yr
|
$10.75 |
Electricity Fees | $6,864 | - |
|
- |
Coal | $4,300,000 | 2,600,000 |
MMBtu
|
$1.65 |
TOTAL YEARLY COSTS | $6,286,712 | |||
RECOMMENDED SAVINGS* | $734,281 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,616 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Coal Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.6231: Utilize controls to operate equipment only when needed | $473,255 | $175,000 |
$80,015
2,330,000
kWh
|
$37,552
-
kW-mo/yr
|
$7,328 |
$348,360
-
MMBtu
|
|
02 | 2.3137: Use power during off-peak periods | $206,416 | $1,600 | - | - | $206,416 | - | |
03 | 2.2424: Use heat in flue gases to preheat products or materials | $30,169 | $97,680 | - | - | - |
$30,169
-
MMBtu
|
|
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $15,825 | - |
$10,189
297,046
kWh
|
$4,716
-
kW-mo/yr
|
$921 | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,767 | $5,679 |
$3,008
87,684
kWh
|
$2,309
-
kW-mo/yr
|
$451 | - | |
06 | 2.7135: Install occupancy sensors | $2,849 | $1,155 |
$2,849
83,065
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $734,281 | $281,114 |
$96,060
2,797,796
kWh
|
$44,577
-
kW-mo/yr
|
$215,115 |
$378,529
-
MMBtu
|
||
TOTAL IMPLEMENTED | $8,616 | $6,834 |
$5,857
170,750
kWh
|
$2,309
-
kW-mo/yr
|
$451 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Coal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs