ITAC Assessment: UU0133
ITAC logo
ITAC Assessment: UU0133
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Limestone
NAICS 327410: Lime Manufacturing
SIC 3281: Cut Stone and Stone Products
Sales Range $50
M
to 100
M
# of Employees 72
Plant Area 12,000
ft2
Annual Production 698,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,477,529 45,444,000
kWh
Electricity Demand $502,320 46,748
kW-mo/yr
Electricity Fees $6,864 -
Coal $4,300,000 2,600,000
MMBtu
TOTAL YEARLY COSTS $6,286,712
RECOMMENDED SAVINGS* $734,281 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,616

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Coal Savings
01 2.6231: Utilize controls to operate equipment only when needed $473,255 $175,000 $80,015
2,330,000
kWh
$37,552
-
kW-mo/yr
$7,328 $348,360
-
MMBtu
02 2.3137: Use power during off-peak periods $206,416 $1,600 - - $206,416 -
03 2.2424: Use heat in flue gases to preheat products or materials $30,169 $97,680 - - - $30,169
-
MMBtu
04 2.4231: Reduce the pressure of compressed air to the minimum required $15,825 - $10,189
297,046
kWh
$4,716
-
kW-mo/yr
$921 -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $5,767 $5,679 $3,008
87,684
kWh
$2,309
-
kW-mo/yr
$451 -
06 2.7135: Install occupancy sensors $2,849 $1,155 $2,849
83,065
kWh
- - -
TOTAL RECOMMENDED $734,281 $281,114 $96,060
2,797,796
kWh
$44,577
-
kW-mo/yr
$215,115 $378,529
-
MMBtu
TOTAL IMPLEMENTED $8,616 $6,834 $5,857
170,750
kWh
$2,309
-
kW-mo/yr
$451 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Coal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs