ITAC Assessment: TT0182
ITAC logo
ITAC Assessment: TT0182
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Mineral Clay
NAICS 327991: Cut Stone and Stone Product Manufacturing
SIC 3281: Cut Stone and Stone Products
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 226,250
ft2
Annual Production 432,000
ton
Production Hrs. Annual 5,200
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $366,318 5,753,600
kWh
Electricity Demand $207,323 19,573
kW-mo/yr
Natural Gas $401,590 116,012
MMBtu
TOTAL YEARLY COSTS $975,231
RECOMMENDED SAVINGS* $66,361 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,011

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $13,618 $20,200 - - $13,618
-
MMBtu
02 2.2511: Insulate bare equipment $12,836 $61,050 - - $12,836
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $11,055 $53,270 $7,443
116,837
kWh
$3,612
-
kW-mo/yr
-
04 2.4322: Use or replace with energy efficient substitutes $9,314 $4,000 $6,529
102,492
kWh
$2,785
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $6,956 $5,000 $5,029
78,955
kWh
$1,927
-
kW-mo/yr
-
06 2.4224: Upgrade controls on compressors $6,416 $19,000 $4,637
72,800
kWh
$1,779
-
kW-mo/yr
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,896 $3,000 $1,896
29,765
kWh
- -
08 2.4239: Eliminate or reduce compressed air usage $1,822 $1,500 $1,822
28,600
kWh
- -
09 2.7261: Install timers and/or thermostats $1,612 $500 $1,512
23,735
kWh
- $100
-
MMBtu
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $836 $600 $836
13,130
kWh
- -
TOTAL RECOMMENDED $66,361 $168,120 $29,704
466,314
kWh
$10,103
-
kW-mo/yr
$26,554
-
MMBtu
TOTAL IMPLEMENTED $38,011 $83,870 $27,808
436,549
kWh
$10,103
-
kW-mo/yr
$100
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs