Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

279

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Gypsum products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT0666 #09 Y:1999 Consider use / purchase of bulk materials where possible $52,500 $45,000
GT0666 #08 Y:1999 Use most efficient type of electric motors $38,797 $151,526
GT0666 #07 Y:1999 Insulate bare equipment $7,967 $8,398
GT0666 #06 Y:1999 Size electric motors for peak operating efficiency $2,354 $3,900
GT0666 #05 Y:1999 Use optimum size and capacity equipment $30,735 $8,017
GT0666 #04 Y:1999 Utilize energy-efficient belts and other improved mechanisms $10,598 $2,500
GT0666 #03 Y:1999 Eliminate leaks in inert gas and compressed air lines/ valves $3,440 $450
GT0666 #02 Y:1999 Adjust burners for efficient operation $366,782 $180,000
GT0666 #01 Y:1999 Change rate schedules or other changes in utility service $30,744 $35,000
AM0344 #07 Y:1999 Replace existing equipment with more suitable substitutes $205 $250
AM0344 #06 Y:1999 Make a practice of turning off lights when not needed $610 -
AM0344 #05 Y:1999 Utilize daylight whenever possible in lieu of artificial light $1,150 $140
AM0344 #04 Y:1999 Reschedule plant operations or reduce load to avoid peaks $21,800 -
AM0344 #03 Y:1999 Insulate bare equipment $27,000 $850
AM0344 #02 Y:1999 Recover and reuse waste material $93,150 $110,000
AM0344 #01 Y:1999 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $481,000 $1,207,000
AM0341 #11 Y:1998 Utilize daylight whenever possible in lieu of artificial light $150 -
AM0341 #10 Y:1998 Reduce illumination to minimum necessary levels $250 -
AM0341 #09 Y:1998 Use synthetic lubricant $415 -
AM0341 #08 Y:1998 Insulate bare equipment $540 $905