Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

279

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Gypsum products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0322 #10 Y:2003 Install equipment (eg compactor) to reduce disposal costs $1,466 $3,496
UF0322 #09 Y:2003 Lower light fixtures in high ceiling areas $159,201 $2,888
UF0322 #08 Y:2003 Reduce illumination to minimum necessary levels $81,073 $860
UF0322 #07 Y:2003 Utilize higher efficiency lamps and/or ballasts $25,483 $47,300
UF0322 #06 Y:2003 Reduce the pressure of compressed air to the minimum required $9,372 -
UF0322 #05 Y:2003 Utilize daylight whenever possible in lieu of artificial light $85,121 $87,198
UF0322 #04 Y:2003 Utilize energy-efficient belts and other improved mechanisms $47,174 -
UF0322 #03 Y:2003 Add area lighting switches $8,639 $303
UF0322 #02 Y:2003 Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $1,420,987 $5,000,000
UF0322 #01 Y:2003 Direct warmest air to combustion intake $2,080,457 $50,000
SF0201 #09 Y:2000 Install equipment (eg compactor) to reduce disposal costs $24,638 $18,750
SF0201 #08 Y:2000 Recover and reuse waste material $1,635 -
SF0201 #07 Y:2000 Recover and reuse waste material $12,259 $7,650
SF0201 #06 Y:2000 Utilize higher efficiency lamps and/or ballasts $3,796 $8,825
SF0201 #05 Y:2000 Install timers on light switches in little used areas $7,180 $11,750
SF0201 #04 Y:2000 Utilize energy-efficient belts and other improved mechanisms $15,456 $15,452
SF0201 #03 Y:2000 Use most efficient type of electric motors $23,492 $19,738
SF0201 #02 Y:2000 Reduce the pressure of compressed air to the minimum required $1,708 $25
SF0201 #01 Y:2000 Apply a protective coating to racks and tanks $4,646 $120
GT0666 #10 Y:1999 Contract a wood pallet recycling company $1,800 -