279
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Gypsum products | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| LS2313 #06 Y:2023 | 06 | 2023 | Improve combustion control capability | $87,048 | $400,000 | |
| LS2313 #05 Y:2023 | 05 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,021 | $180 | |
| LS2313 #04 Y:2023 | 04 | 2023 | Utilize higher efficiency lamps and/or ballasts | $3,862 | $187 | |
| LS2313 #03 Y:2023 | 03 | 2023 | Install occupancy sensors | $2,452 | $75 | |
| LS2313 #02 Y:2023 | 02 | 2023 | Utilize energy-efficient belts and other improved mechanisms | $7,259 | $150 | |
| LS2313 #01 Y:2023 | 01 | 2023 | Reduce the pressure of compressed air to the minimum required | $6,049 | $50 | |
| UF0600 #07 Y:2023 | 07 | 2023 | Improve space comfort conditioning | $32,555 | $3,179 | |
| UF0600 #06 Y:2023 | 06 | 2023 | Install timers on light switches in little used areas | $1,118 | $591 | |
| UF0600 #05 Y:2023 | 05 | 2023 | Minimize condenser cooling water temperature | $1,132 | $1,440 | |
| UF0600 #04 Y:2023 | 04 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,508 | $584 | |
| UF0600 #03 Y:2023 | 03 | 2023 | Install soft-start to eliminate nuisance trips | $4,976 | $11,866 | |
| UF0600 #02 Y:2023 | 02 | 2023 | Use most efficient type of electric motors | $17,863 | $38,735 | |
| UF0600 #01 Y:2023 | 01 | 2023 | Use demand controller or load shedder | $20,830 | $11,347 | |
| UF0599 #11 Y:2023 | 11 | 2023 | Level three - install or modify control system with communication and nonlocal external information (i.e. weather foreca | $5,191 | $11,500 | |
| UF0599 #10 Y:2023 | 10 | 2023 | Improve space comfort conditioning | $34,250 | $2,384 | |
| UF0599 #09 Y:2023 | 09 | 2023 | Install turbulators | $4,318 | $5,000 | |
| UF0599 #08 Y:2023 | 08 | 2023 | Use most efficient type of electric motors | $4,851 | $24,000 | |
| UF0599 #07 Y:2023 | 07 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $6,225 | $412 | |
| UF0599 #06 Y:2023 | 06 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $6,242 | $9,619 | |
| UF0599 #05 Y:2023 | 05 | 2023 | Use demand controller or load shedder | $13,170 | $9,156 |