ITAC Assessment: LS2313
ITAC logo
ITAC Assessment: LS2313
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Plasterboard
NAICS 327420: Gypsum Product Manufacturing
SIC 3275: Gypsum Products
Sales Range $50
M
to 100
M
# of Employees 70
Plant Area 714,000
ft2
Annual Production 300,000,000
thousand feet
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,227,413 12,730,999
kWh
Natural Gas $4,433,545 583,151
MMBtu
TOTAL YEARLY COSTS $5,660,958
RECOMMENDED SAVINGS* $109,691 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $109,691

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $6,049 $50 $6,049
63,013
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $7,259 $150 $7,259
75,611
kWh
-
03 2.7135: Install occupancy sensors $2,452 $75 $2,452
25,544
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,862 $187 $3,862
40,226
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,021 $180 $3,021
31,465
kWh
-
06 2.1116: Improve combustion control capability $87,048 $400,000 - $87,048
-
MMBtu
TOTAL RECOMMENDED $109,691 $400,642 $22,643
235,859
kWh
$87,048
-
MMBtu
TOTAL IMPLEMENTED $109,691 $400,642 $22,643
235,859
kWh
$87,048
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs