Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

279

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Gypsum products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
ME0252 #06 Y:1998 Use most efficient type of electric motors $1,309 $1,457
ME0252 #05 Y:1998 Utilize higher efficiency lamps and/or ballasts $2,171 $1,923
ME0252 #04 Y:1998 Insulate bare equipment $4,866 $6,900
ME0252 #03 Y:1998 Utilize energy-efficient belts and other improved mechanisms $10,928 $2,675
ME0252 #02 Y:1998 Use adjustable frequency drive or multiple speed motors on existing system $15,186 $28,000
ME0252 #01 Y:1998 Use waste heat from hot flue gases to preheat $67,656 $52,600
AR0144 #09 Y:1998 Automate payroll system $217,800 $85,000
AR0144 #08 Y:1998 Purchase re-conditioned material instead of new $23,958 -
AR0144 #07 Y:1998 Meter waste water $6,423 $500
AR0144 #06 Y:1998 Insulate bare equipment $7,588 $10,500
AR0144 #05 Y:1998 Eliminate leaks in inert gas and compressed air lines/ valves $8,575 $160
AR0144 #04 Y:1998 Utilize energy-efficient belts and other improved mechanisms $7,876 -
AR0144 #03 Y:1998 Use most efficient type of electric motors $530 $333
AR0144 #02 Y:1998 Install compressor air intakes in coolest locations $2,907 $1,060
AR0144 #01 Y:1998 Optimize plant power factor $9,562 $14,895
ND0247 #08 Y:1996 Eliminate/reduce an operation $1,497 $190
ND0247 #07 Y:1996 Pay utility bills on time $2,142 -
ND0247 #06 Y:1996 Use waste heat from hot flue gases to preheat incoming fluids $16,775 $12,966
ND0247 #05 Y:1996 Utilize higher efficiency lamps and/or ballasts $297 $243
ND0247 #04 Y:1996 Use photocell controls $780 $600