ITAC Assessment: AR0144
ITAC logo
ITAC Assessment: AR0144
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Gypsum Wallboard
NAICS
n/a
SIC 3275: Gypsum Products
Sales Range $50
M
to 100
M
# of Employees 125
Plant Area 267,765
ft2
Annual Production 405,000
thousand feet
Production Hrs. Annual 8,712
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $605,208 16,200,762
kWh
Electricity Demand $181,682 25,482
kW-mo/yr
Natural Gas $2,057,712 955,159
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $285,219 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,105

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.3212: Optimize plant power factor $9,562 $14,895 - $9,562
-
kW-mo/yr
- - - - -
02 2.4221: Install compressor air intakes in coolest locations $2,907 $1,060 $2,298
62,134
kWh
$609
-
kW-mo/yr
- - - - -
03 2.4133: Use most efficient type of electric motors $530 $333 $422
11,430
kWh
$108
-
kW-mo/yr
- - - - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $7,876 - $6,237
168,523
kWh
$1,639
-
kW-mo/yr
- - - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,575 $160 $6,776
183,177
kWh
$1,799
-
kW-mo/yr
- - - - -
06 2.2511: Insulate bare equipment $7,588 $10,500 - - $7,588
-
MMBtu
- - - -
07 3.4155: Meter waste water $6,423 $500 - - - $6,423
-
Tgal
- - -
08 4.222: Purchase re-conditioned material instead of new $23,958 - - - - - $418
-
lb
- $23,540
09 4.447: Automate payroll system $217,800 $85,000 - - - - - $217,800 -
TOTAL RECOMMENDED $285,219 $112,448 $15,733
425,264
kWh
$13,717
-
kW-mo/yr
$7,588
-
MMBtu
$6,423
-
Tgal
$418
-
lb
$217,800 $23,540
TOTAL IMPLEMENTED $9,105 $493 $7,198
194,607
kWh
$1,907
-
kW-mo/yr
- - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs