ITAC Assessment: ME0252
ITAC logo
ITAC Assessment: ME0252
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product dry wall board
NAICS
n/a
SIC 3275: Gypsum Products
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 205,000
ft2
Annual Production 325,000,000
thousand feet
Production Hrs. Annual 8,384
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,464,369 15,328,253
kWh
Electricity Demand $241,628 29,265
kW-mo/yr
Electricity Fees $6,022 -
Natural Gas $3,211,391 745,188
MMBtu
Fuel Oil #2 $11,191 2,843
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $194,208 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $188,862

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings By-product Production Savings
01 2.2414: Use waste heat from hot flue gases to preheat $67,656 $52,600 - - $67,656
-
MMBtu
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $15,186 $28,000 $15,186
162,954
kWh
- - - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $10,928 $2,675 $10,928
130,129
kWh
- - - -
04 2.2511: Insulate bare equipment $4,866 $6,900 - - $4,866
-
MMBtu
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,171 $1,923 $1,853
23,154
kWh
$318
-
kW-mo/yr
- - -
06 2.4133: Use most efficient type of electric motors $1,309 $1,457 $1,148
14,361
kWh
$161
-
kW-mo/yr
- - -
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,213 $1,405 $1,016
12,603
kWh
$446
-
kW-mo/yr
$(-249.0)
-
MMBtu
- -
08 2.4239: Eliminate or reduce compressed air usage $466 $225 $466
8,792
kWh
- - - -
09 2.4322: Use or replace with energy efficient substitutes $233 $375 $233
2,931
kWh
- - - -
10 4.222: Purchase re-conditioned material instead of new $89,700 $11,750 - - - $89,700 -
11 3.5316: Contract a wood pallet recycling company $480 - - - - - $480
TOTAL RECOMMENDED $194,208 $107,310 $30,830
354,924
kWh
$925
-
kW-mo/yr
$72,273
-
MMBtu
$89,700 $480
TOTAL IMPLEMENTED $188,862 $100,410 $30,830
354,924
kWh
$925
-
kW-mo/yr
$67,407
-
MMBtu
$89,700 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs