Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

279

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Gypsum products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
DL0234 #04 Y:2023 Repair furnaces and oven doors so that they seal efficiently $76,734 $166,100
DL0234 #03 Y:2023 Repair furnaces and oven doors so that they seal efficiently $95,717 $35,600
DL0234 #02 Y:2023 Utilize energy-efficient belts and other improved mechanisms $21,550 $30,000
DL0234 #01 Y:2023 Isolate hot or cold equipment $36,400 $82,500
DL0231 #08 Y:2023 Repair furnaces and oven doors so that they seal efficiently $266,000 $385,800
DL0231 #07 Y:2023 Improve combustion control capability $211,766 $21,800
DL0231 #06 Y:2023 Maintain machines to reduce leaks $441,845 $39,600
DL0231 #05 Y:2023 Maintain machines to reduce leaks $132,876 $34,600
DL0231 #04 Y:2023 Insulate bare equipment $25,112 $9,768
DL0231 #03 Y:2023 Use or replace with energy efficient substitutes $149,450 $333,800
DL0231 #02 Y:2023 Replace existing equipment with more suitable substitutes $229,694 $2,880,000
DL0231 #01 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $172,461 $34,600
UF0601 #08 Y:2023 Improve space comfort conditioning $34,014 $3,179
UF0601 #07 Y:2023 Level three - install or modify control system with communication and nonlocal external information (i.e. weather foreca $61,813 $29,295
UF0601 #06 Y:2023 Level one – add communication using iiot devices to existing control system to modify operations $74,558 -
UF0601 #05 Y:2023 Utilize energy-efficient belts and other improved mechanisms $12,983 -
UF0601 #04 Y:2023 Improve air circulation with destratification fans / other methods $32,141 $49,680
UF0601 #03 Y:2023 Reduce combustion air flow to optimum $280,640 $30,000
UF0601 #02 Y:2023 Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $1,202,647 $3,920,000
UF0601 #01 Y:2023 Change rate schedules or other changes in utility service $9,858,540 -