Assessment Year | 2023 |
---|---|
Principal Product | Gypsum Drywall |
NAICS | 327420: Gypsum Product Manufacturing |
SIC | 3275: Gypsum Products |
Sales Range | $50 M to 100M |
# of Employees | 160 |
Plant Area |
400,000
ft2
|
Annual Production | 700,000
ton
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Maryland |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $3,742,948 | 41,233,382 |
kWh
|
$0.091 |
Electricity Fees | $1,019,007 | - |
|
- |
Natural Gas | $14,702,246 | 1,723,398 |
MMBtu
|
$8.53 |
TOTAL YEARLY COSTS | $19,464,201 | |||
RECOMMENDED SAVINGS* | $1,629,204 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $172,461 | $34,600 |
$172,461
1,449,254
kWh
|
- | - | |
02 | 4.652: Replace existing equipment with more suitable substitutes | $229,694 | $2,880,000 |
$169,694
1,426,000
kWh
|
- | $60,000 | |
03 | 2.4322: Use or replace with energy efficient substitutes | $149,450 | $333,800 |
$114,450
961,768
kWh
|
- | $35,000 | |
04 | 2.2511: Insulate bare equipment | $25,112 | $9,768 | - |
$25,112
-
MMBtu
|
- | |
05 | 3.7311: Maintain machines to reduce leaks | $132,876 | $34,600 | - |
$132,876
-
MMBtu
|
- | |
06 | 3.7311: Maintain machines to reduce leaks | $441,845 | $39,600 | - |
$441,845
-
MMBtu
|
- | |
07 | 2.1116: Improve combustion control capability | $211,766 | $21,800 | - |
$211,766
-
MMBtu
|
- | |
08 | 2.1135: Repair furnaces and oven doors so that they seal efficiently | $266,000 | $385,800 | - |
$266,000
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $1,629,204 | $3,739,968 |
$456,605
3,837,022
kWh
|
$1,077,599
-
MMBtu
|
$95,000 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs