34
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Concrete products, except block and brick | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UU0269 #08 Y:2025 | 08 | 2025 | Use photocell controls | $267 | $267 | |
| UU0269 #07 Y:2025 | 07 | 2025 | Install occupancy sensors | $176 | $390 | |
| UU0269 #06 Y:2025 | 06 | 2025 | Utilize higher efficiency lamps and/or ballasts | $230 | $263 | |
| UU0269 #05 Y:2025 | 05 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,790 | $372 | |
| UU0269 #04 Y:2025 | 04 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $3,845 | $13,786 | |
| UU0269 #03 Y:2025 | 03 | 2025 | Reduce the pressure of compressed air to the minimum required | $587 | $1,800 | |
| UU0269 #02 Y:2025 | 02 | 2025 | Increase efficiency of trucks | $7,008 | $32,925 | |
| UU0269 #01 Y:2025 | 01 | 2025 | Use solar heat to make electricty | $9,444 | $73,645 | |
| UU0207 #08 Y:2022 | 08 | 2022 | Lower compressor pressure through a/c system modification | $265 | $750 | |
| UU0207 #07 Y:2022 | 07 | 2022 | Utilize higher efficiency lamps and/or ballasts | $626 | $1,700 | |
| UU0207 #06 Y:2022 | 06 | 2022 | Eliminate leaks in inert gas and compressed air lines/ valves | $850 | $1,000 | |
| UU0207 #05 Y:2022 | 05 | 2022 | Recover waste heat from equipment | $1,912 | $1,585 | |
| UU0207 #04 Y:2022 | 04 | 2022 | Optimize plant power factor | $4,008 | $3,433 | |
| UU0207 #03 Y:2022 | 03 | 2022 | Change procedures / equipment / operating conditions | $6,884 | $750 | |
| UU0207 #02 Y:2022 | 02 | 2022 | Change procedures / equipment / operating conditions | $7,250 | $5,000 | |
| UU0207 #01 Y:2022 | 01 | 2022 | Use solar heat to heat water | $15,757 | $75,487 | |
| BS0086 #05 Y:2016 | 05 | 2016 | Install compressor air intakes in coolest locations | $1,268 | $147 | |
| BS0086 #04 Y:2016 | 04 | 2016 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,877 | $1,280 | |
| BS0086 #03 Y:2016 | 03 | 2016 | Utilize controls to operate equipment only when needed | $2,887 | $280 | |
| BS0086 #02 Y:2016 | 02 | 2016 | Replace boiler | $4,643 | $61,724 |