ITAC Assessment: UU0207
ITAC logo
ITAC Assessment: UU0207
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Concrete and Gypsum
NAICS 327390: Other Concrete Product Manufacturing
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 36,000
ft2
Annual Production 132,000
units
Production Hrs. Annual 3,120
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $10,963 305,600
kWh
Electricity Demand $28,396 1,750
kW-mo/yr
Electricity Fees $4,566 -
Natural Gas $22,207 3,192
MMBtu
Fuel Oil #1 $25,106 1,165
MMBtu
Fuel Oil #2 $4,780 243
MMBtu
Waste Disposal Costs
Water Usage $3,722 793
Tgal
Solid Waste (non-haz) $92,026 2,688,120
lb
TOTAL YEARLY COSTS $191,765
RECOMMENDED SAVINGS* $37,552 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,545

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #1 Savings One-time Revenue or Avoided Cost Savings
01 2.9112: Use solar heat to heat water $15,757 $75,487 - - - $15,757
-
MMBtu
-
02 3.1191: Change procedures / equipment / operating conditions $7,250 $5,000 - - - - $7,250
03 3.1191: Change procedures / equipment / operating conditions $6,884 $750 - - - - $6,884
04 2.3212: Optimize plant power factor $4,008 $3,433 - $4,008
-
kW-mo/yr
- - -
05 2.2437: Recover waste heat from equipment $1,912 $1,585 - - $1,912
-
MMBtu
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $850 $1,000 $295
8,206
kWh
$555
-
kW-mo/yr
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $626 $1,700 $626
17,308
kWh
- - - -
08 2.7263: Lower compressor pressure through a/c system modification $265 $750 $91
2,533
kWh
$174
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $37,552 $89,705 $1,013
28,047
kWh
$4,736
-
kW-mo/yr
$1,912
-
MMBtu
$15,757
-
MMBtu
$14,134
TOTAL IMPLEMENTED $14,545 $9,218 $1,013
28,047
kWh
$4,736
-
kW-mo/yr
$1,912
-
MMBtu
- $6,884
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #1 Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs