ITAC Assessment: UU0281
ITAC logo
ITAC Assessment: UU0281
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Education
NAICS 611310: Colleges, Universities, and Professional Schools
SIC 8221: Colleges, Universities, and Professional Schools
Sales Range less than $500
k
# of Employees 20
Plant Area 94,750
ft2
Annual Production 1
units
Production Hrs. Annual 6,082
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $15,878 512,530
kWh
Electricity Demand $19,817 1,414
kW-mo/yr
Natural Gas $1,766 366
MMBtu
TOTAL YEARLY COSTS $37,461
RECOMMENDED SAVINGS* $12,955 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $869 $1,930 $432
13,861
kWh
$437
-
kW-mo/yr
-
02 2.3191: Use demand controller or load shedder $2,120 $2,000 - $5,120
-
kW-mo/yr
$(-3,000.0)
03 2.1224: Replace boiler $749 $2,450 $172
4,525
kWh
$577
-
kW-mo/yr
-
04 2.9114: Use solar heat to make electricty $9,217 $118,731 $5,077
163,790
kWh
$4,140
-
kW-mo/yr
-
TOTAL RECOMMENDED $12,955 $125,111 $5,682
182,176
kWh
$10,273
-
kW-mo/yr
$(-3,000.0)
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs