ITAC Assessment: OK0153
ITAC logo
ITAC Assessment: OK0153
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product CUSTOM HEAT TREATING
NAICS
n/a
SIC 3429: Hardware, Not Elsewhere Classified
Sales Range $500
k
to 1
M
# of Employees 10
Plant Area
n/a
Annual Production 3,360,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,797 687,866
kWh
Natural Gas $92,926 24,154
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,225 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $89

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $89 $75 $89
1,758
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $580 $300 - $580
-
MMBtu
03 2.7422: Plant trees or shrubs near windows to shield from sunlight $104 $259 $104
2,052
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $282 $130 $282
5,569
kWh
-
05 2.2414: Use waste heat from hot flue gases to preheat $4,170 $7,500 - $4,170
-
MMBtu
TOTAL RECOMMENDED $5,225 $8,264 $475
9,379
kWh
$4,750
-
MMBtu
TOTAL IMPLEMENTED $89 $75 $89
1,758
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs