Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Concrete products, except block and brick
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0893 #10 Y:2013 Utilize higher efficiency lamps and/or ballasts $974 $10,900
UD0893 #09 Y:2013 Utilize higher efficiency lamps and/or ballasts $3,862 $19,001
UD0893 #08 Y:2013 Analyze flue gas for proper air/fuel ratio $1,001 $500
UD0893 #07 Y:2013 Repair or replace steam traps $3,389 $9,600
UD0893 #06 Y:2013 Replace air curtain doors with solid doors $1,159 $1,578
UD0893 #05 Y:2013 Reduce the pressure of compressed air to the minimum required $26 -
UD0893 #04 Y:2013 Eliminate or reduce compressed air usage $5,267 $4,330
UD0893 #03 Y:2013 Turn off equipment when not in use $184 -
UD0893 #02 Y:2013 Turn off equipment when not in use $350 $250
UD0893 #01 Y:2013 Utilize energy-efficient belts and other improved mechanisms $711 -
UD0577 #06 Y:1999 Use most efficient type of electric motors $2,171 $2,655
UD0577 #05 Y:1999 Install equipment to move product $35,600 $57,000
UD0577 #04 Y:1999 Recover and reuse waste material $88,813 $200,000
UD0577 #03 Y:1999 Employ modular jigs to reduce process set-up time $118,825 $15,000
UD0577 #02 Y:1999 Install equipment to move product $320,742 $525,000
UD0577 #01 Y:1999 Add equipment/ operators to reduce production bottleneck $640,050 $1,000,000
UD0546 #06 Y:1998 Recover waste heat from equipment $622 $600
UD0546 #05 Y:1998 Reduce scrap production $1,933 -
UD0546 #04 Y:1998 Replace electrically-operated equipment with fossil fuel equipment $2,403 $4,000
UD0546 #03 Y:1998 Utilize higher efficiency lamps and/or ballasts $2,450 $6,900