Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

128

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Concrete block and brick
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AS0556 #06 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $703 $532
AS0556 #05 Y:2023 Use photocell controls $4,658 $7,034
AS0556 #04 Y:2023 Utilize energy-efficient belts and other improved mechanisms $5,579 $2,858
AS0556 #03 Y:2023 Utilize higher efficiency lamps and/or ballasts $19,073 $10,283
AS0556 #02 Y:2023 Add air shields to trucks to increase fuel mileage $35,924 $12,039
AS0556 #01 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $53,360 $14,735
AS0555 #07 Y:2023 Turn off equipment when not in use $871 $21
AS0555 #06 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $1,078 $399
AS0555 #05 Y:2023 Utilize energy-efficient belts and other improved mechanisms $1,534 $2,105
AS0555 #04 Y:2023 Establish a predictive maintenance program $2,107 $1,243
AS0555 #03 Y:2023 Develop standard procedures to improve internal yields $3,260 $2,932
AS0555 #02 Y:2023 Add air shields to trucks to increase fuel mileage $10,191 $10,364
AS0555 #01 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $29,191 $11,546
SF0603 #08 Y:2023 Replace fossil fuel equipment with electrical equipment $568,246 $3,565,479
SF0603 #07 Y:2023 Install / repair insulation on steam lines $608 $2,572
SF0603 #06 Y:2023 Use waste heat from hot flue gases to preheat $31,772 $124,644
SF0603 #05 Y:2023 Use photocell controls $3,805 $9,018
SF0603 #04 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $4,008 $7,651
SF0603 #03 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $7,760 $1,440
SF0603 #02 Y:2023 Utilize energy-efficient belts and other improved mechanisms $1,983 $141