Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

148

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Concrete block and brick
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UL2615 #04 Y:2026 Use solar heat to make electricty $33,051 $262,820
UL2615 #03 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $13,910 $18,224
UL2615 #02 Y:2026 Utilize higher efficiency lamps and/or ballasts $1,206 $1,761
UL2615 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $3,149 $735
UW2517 #03 Y:2025 Repair and eliminate steam leaks $4,812 $3,250
UW2517 #02 Y:2025 Insulate glazing, walls, ceilings, and roofs $80,006 $297,653
UW2517 #01 Y:2025 Install / repair insulation on steam lines $1,400 $1,080
NT0042 #06 Y:2025 Apply for tax-free status for energy purchases $19,525 $5,000
NT0042 #05 Y:2025 Lower temperature during the winter season and vice-versa $1,625 $603
NT0042 #04 Y:2025 Reduce the pressure of compressed air to the minimum required $28,561 -
NT0042 #03 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,317 $5,609
NT0042 #02 Y:2025 Install occupancy sensors $146 $142
NT0042 #01 Y:2025 Utilize higher efficiency lamps and/or ballasts $1,093 $2,408
NT0041 #07 Y:2025 Apply for tax-free status for energy purchases $10,577 $5,000
NT0041 #06 Y:2025 Use or replace with energy efficient substitutes $187,425 $55,173
NT0041 #05 Y:2025 Analyze flue gas for proper air/fuel ratio $1,667 $1,258
NT0041 #04 Y:2025 Upgrade controls on compressors $8,034 $5,064
NT0041 #03 Y:2025 Reduce the pressure of compressed air to the minimum required $3,280 -
NT0041 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $3,213 $5,609
NT0041 #01 Y:2025 Utilize higher efficiency lamps and/or ballasts $1,213 $1,322