148
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Concrete block and brick | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UL2615 #04 Y:2026 | 04 | 2026 | Use solar heat to make electricty | $33,051 | $262,820 |
n/a
|
| UL2615 #03 Y:2026 | 03 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $13,910 | $18,224 |
n/a
|
| UL2615 #02 Y:2026 | 02 | 2026 | Utilize higher efficiency lamps and/or ballasts | $1,206 | $1,761 |
n/a
|
| UL2615 #01 Y:2026 | 01 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,149 | $735 |
n/a
|
| UW2517 #03 Y:2025 | 03 | 2025 | Repair and eliminate steam leaks | $4,812 | $3,250 | |
| UW2517 #02 Y:2025 | 02 | 2025 | Insulate glazing, walls, ceilings, and roofs | $80,006 | $297,653 | |
| UW2517 #01 Y:2025 | 01 | 2025 | Install / repair insulation on steam lines | $1,400 | $1,080 | |
| NT0042 #06 Y:2025 | 06 | 2025 | Apply for tax-free status for energy purchases | $19,525 | $5,000 | |
| NT0042 #05 Y:2025 | 05 | 2025 | Lower temperature during the winter season and vice-versa | $1,625 | $603 | |
| NT0042 #04 Y:2025 | 04 | 2025 | Reduce the pressure of compressed air to the minimum required | $28,561 | - | |
| NT0042 #03 Y:2025 | 03 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,317 | $5,609 | |
| NT0042 #02 Y:2025 | 02 | 2025 | Install occupancy sensors | $146 | $142 | |
| NT0042 #01 Y:2025 | 01 | 2025 | Utilize higher efficiency lamps and/or ballasts | $1,093 | $2,408 | |
| NT0041 #07 Y:2025 | 07 | 2025 | Apply for tax-free status for energy purchases | $10,577 | $5,000 | |
| NT0041 #06 Y:2025 | 06 | 2025 | Use or replace with energy efficient substitutes | $187,425 | $55,173 | |
| NT0041 #05 Y:2025 | 05 | 2025 | Analyze flue gas for proper air/fuel ratio | $1,667 | $1,258 | |
| NT0041 #04 Y:2025 | 04 | 2025 | Upgrade controls on compressors | $8,034 | $5,064 | |
| NT0041 #03 Y:2025 | 03 | 2025 | Reduce the pressure of compressed air to the minimum required | $3,280 | - | |
| NT0041 #02 Y:2025 | 02 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,213 | $5,609 | |
| NT0041 #01 Y:2025 | 01 | 2025 | Utilize higher efficiency lamps and/or ballasts | $1,213 | $1,322 |