ITAC Assessment: AS0555
ITAC logo
ITAC Assessment: AS0555
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product concrete construction blocks
NAICS 327331: Concrete Block and Brick Manufacturing
SIC 3271: Concrete Block and Brick
Sales Range $5
M
to 10
M
# of Employees 24
Plant Area 40,000
ft2
Annual Production 5,000,000
units
Production Hrs. Annual 3,094
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,794 588,050
kWh
Electricity Demand $47,982 2,602
kW-mo/yr
Electricity Fees $32,780 -
Fuel Oil #1 $73,562 2,195
MMBtu
TOTAL YEARLY COSTS $185,118
RECOMMENDED SAVINGS* $48,232 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #1 Savings Ancillary Material Cost Savings Primary Product Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $29,191 $11,546 $19,750
377,132
kWh
$9,441
-
kW-mo/yr
- - -
02 2.8223: Add air shields to trucks to increase fuel mileage $10,191 $10,364 - - $10,191
-
MMBtu
- -
03 4.122: Develop standard procedures to improve internal yields $3,260 $2,932 - - - - $3,260
04 2.4157: Establish a predictive maintenance program $2,107 $1,243 $523
9,977
kWh
$922
-
kW-mo/yr
- - $662
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,534 $2,105 - - - $1,534 -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,078 $399 $469
8,956
kWh
$609
-
kW-mo/yr
- - -
07 2.6218: Turn off equipment when not in use $871 $21 $456
8,712
kWh
$415
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $48,232 $28,610 $21,198
404,777
kWh
$11,387
-
kW-mo/yr
$10,191
-
MMBtu
$1,534 $3,922
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #1 Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs