Assessment Year | 2023 |
---|---|
Principal Product | concrete construction blocks |
NAICS | 327331: Concrete Block and Brick Manufacturing |
SIC | 3271: Concrete Block and Brick |
Sales Range | $5 M to 10M |
# of Employees | 24 |
Plant Area |
40,000
ft2
|
Annual Production | 5,000,000
units
|
Production Hrs. Annual | 3,094
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $30,794 | 588,050 |
kWh
|
$0.052 |
Electricity Demand | $47,982 | 2,602 |
kW-mo/yr
|
$18.44 |
Electricity Fees | $32,780 | - |
|
- |
Fuel Oil #1 | $73,562 | 2,195 |
MMBtu
|
$33.51 |
TOTAL YEARLY COSTS | $185,118 | |||
RECOMMENDED SAVINGS* | $48,232 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #1 Savings | Ancillary Material Cost Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $29,191 | $11,546 |
$19,750
377,132
kWh
|
$9,441
-
kW-mo/yr
|
- | - | - | |
02 | 2.8223: Add air shields to trucks to increase fuel mileage | $10,191 | $10,364 | - | - |
$10,191
-
MMBtu
|
- | - | |
03 | 4.122: Develop standard procedures to improve internal yields | $3,260 | $2,932 | - | - | - | - | $3,260 | |
04 | 2.4157: Establish a predictive maintenance program | $2,107 | $1,243 |
$523
9,977
kWh
|
$922
-
kW-mo/yr
|
- | - | $662 | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,534 | $2,105 | - | - | - | $1,534 | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,078 | $399 |
$469
8,956
kWh
|
$609
-
kW-mo/yr
|
- | - | - | |
07 | 2.6218: Turn off equipment when not in use | $871 | $21 |
$456
8,712
kWh
|
$415
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $48,232 | $28,610 |
$21,198
404,777
kWh
|
$11,387
-
kW-mo/yr
|
$10,191
-
MMBtu
|
$1,534 | $3,922 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #1 Savings | Ancillary Material Cost Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs