ITAC Assessment: AS0556
ITAC logo
ITAC Assessment: AS0556
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product concrete blocks
NAICS 327331: Concrete Block and Brick Manufacturing
SIC 3271: Concrete Block and Brick
Sales Range $10
M
to 50
M
# of Employees 24
Plant Area 68,000
ft2
Annual Production 5,000,000
units
Production Hrs. Annual 5,916
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,300 1,346,000
kWh
Electricity Demand $11,712 3,904
kW-mo/yr
Electricity Fees $42,326 -
Fuel Oil #1 $233,320 6,926
MMBtu
TOTAL YEARLY COSTS $378,658
RECOMMENDED SAVINGS* $119,297 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #1 Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $53,360 $14,735 $49,557
730,676
kWh
$3,803
-
kW-mo/yr
- - -
02 2.8223: Add air shields to trucks to increase fuel mileage $35,924 $12,039 - - $35,924
-
MMBtu
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $19,073 $10,283 $17,700
260,943
kWh
$1,616
-
kW-mo/yr
- $(-243.0) -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,579 $2,858 - - - - $5,579
05 2.7134: Use photocell controls $4,658 $7,034 $4,342
64,022
kWh
$316
-
kW-mo/yr
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $703 $532 $662
9,762
kWh
$41
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $119,297 $47,481 $72,261
1,065,403
kWh
$5,776
-
kW-mo/yr
$35,924
-
MMBtu
$(-243.0) $5,579
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #1 Savings One-time Revenue or Avoided Cost Savings Primary Product Savings