Assessment Year | 2023 |
---|---|
Principal Product | concrete blocks |
NAICS | 327331: Concrete Block and Brick Manufacturing |
SIC | 3271: Concrete Block and Brick |
Sales Range | $10 M to 50M |
# of Employees | 24 |
Plant Area |
68,000
ft2
|
Annual Production | 5,000,000
units
|
Production Hrs. Annual | 5,916
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $91,300 | 1,346,000 |
kWh
|
$0.068 |
Electricity Demand | $11,712 | 3,904 |
kW-mo/yr
|
$3.00 |
Electricity Fees | $42,326 | - |
|
- |
Fuel Oil #1 | $233,320 | 6,926 |
MMBtu
|
$33.69 |
TOTAL YEARLY COSTS | $378,658 | |||
RECOMMENDED SAVINGS* | $119,297 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #1 Savings | One-time Revenue or Avoided Cost Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $53,360 | $14,735 |
$49,557
730,676
kWh
|
$3,803
-
kW-mo/yr
|
- | - | - | |
02 | 2.8223: Add air shields to trucks to increase fuel mileage | $35,924 | $12,039 | - | - |
$35,924
-
MMBtu
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $19,073 | $10,283 |
$17,700
260,943
kWh
|
$1,616
-
kW-mo/yr
|
- | $(-243.0) | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,579 | $2,858 | - | - | - | - | $5,579 | |
05 | 2.7134: Use photocell controls | $4,658 | $7,034 |
$4,342
64,022
kWh
|
$316
-
kW-mo/yr
|
- | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $703 | $532 |
$662
9,762
kWh
|
$41
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $119,297 | $47,481 |
$72,261
1,065,403
kWh
|
$5,776
-
kW-mo/yr
|
$35,924
-
MMBtu
|
$(-243.0) | $5,579 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #1 Savings | One-time Revenue or Avoided Cost Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs