Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

93

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Vitreous china plumbing fixtures and china and earthenware fittings and bathroom accessories
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UC2603 #11 Y:2026 Develop standard procedures to improve internal yields $20,020 $3,100
UC2603 #10 Y:2026 Modify startup/shutdown times $10,400 $3,600
UC2603 #09 Y:2026 Eliminate or reduce compressed air usage $3,406 $2,250
UC2603 #08 Y:2026 Utilize higher efficiency lamps and/or ballasts $2,596 $16,800
UC2603 #07 Y:2026 Utilize higher efficiency lamps and/or ballasts $1,471 $10,650
UC2603 #06 Y:2026 Install occupancy sensors $2,195 $7,200
UC2603 #05 Y:2026 Insulate bare equipment $507 $800
UC2603 #04 Y:2026 Use cooling tower or economizer to replace chiller cooling $7,848 $15,200
UC2603 #03 Y:2026 Reduce the pressure of compressed air to the minimum required $2,078 -
UC2603 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $1,051 $1,365
UC2603 #01 Y:2026 Increase use of automation $2,600 $1,800
AM0960 #04 Y:2025 Use solar heat to make electricty $80,488 $1,250,900
AM0960 #03 Y:2025 Re-size charging openings or add a movable door on equipment $1,654 $204
AM0960 #02 Y:2025 Schedule baking times of small and large components $2,820 $50
AM0960 #01 Y:2025 Optimize plant power factor $47,713 $27,900
TT0308 #06 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $642 $1,540
TT0308 #05 Y:2023 Reduce the pressure of compressed air to the minimum required $1,800 $225
TT0308 #04 Y:2023 Apply for tax-free status for energy purchases $3,092 -
TT0308 #03 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $6,781 $4,500
TT0308 #02 Y:2023 Utilize higher efficiency lamps and/or ballasts $8,802 $5,726