Assessment Year | 2019 |
---|---|
Principal Product | Vitreous plumbing fixtures |
NAICS | 327110: Pottery, Ceramics, and Plumbing Fixture Manufacturing |
SIC | 3261: Vitreous China Plumbing Fixtures and China and Earthenware Fittings and Bathroom Accessories |
Sales Range | $100 M to 500M |
# of Employees | 100 |
Plant Area |
639,413
ft2
|
Annual Production | 6,796,135
units
|
Production Hrs. Annual | 7,056
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $434,169 | 5,642,996 |
kWh
|
$0.077 | |
Natural Gas | $694,995 | 187,858 |
MMBtu
|
$3.70 | |
Waste Disposal Costs | |||||
Water Usage | $9,968 | 6,070 |
Tgal
|
$1.64 | |
Water Disposal | $18,101 | 5,243 |
Tgal
|
$3.45 | |
TOTAL YEARLY COSTS | $1,157,233 | ||||
RECOMMENDED SAVINGS* | $71,222 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $42,169 | $92,680 |
$42,169
548,077
kWh
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,023 | $49,220 |
$10,023
130,276
kWh
|
- | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $8,143 | $8,425 |
$8,143
105,840
kWh
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,150 | $2,000 |
$5,150
66,936
kWh
|
- | |
05 | 2.2414: Use waste heat from hot flue gases to preheat | $3,217 | $7,000 | - |
$3,217
-
MMBtu
|
|
06 | 2.7423: Reduce heat gain by window tinting | $1,426 | $4,100 | - |
$1,426
-
MMBtu
|
|
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,094 | $2,750 |
$1,094
14,212
kWh
|
- | |
TOTAL RECOMMENDED | $71,222 | $166,175 |
$66,579
865,341
kWh
|
$4,643
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs