ITAC Assessment: MS0227
ITAC logo
ITAC Assessment: MS0227
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Wooden Furniture
NAICS 337122: Nonupholstered Wood Household Furniture Manufacturing
SIC 2511: Wood Household Furniture, Except Upholstered
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 250,000
ft2
Annual Production 60,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $131,970 3,987,000
kWh
Electricity Demand $182,564 18,790
kW-mo/yr
Electricity Fees $6,545 -
Natural Gas $17,516 2,286
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,460 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,252

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $19,277 - - $18,992
-
kW-mo/yr
$285
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $9,782 $5,356 $2,182
65,911
kWh
$7,454
-
kW-mo/yr
$146
03 2.7231: Use radiant heater for spot heating $2,347 $400 $477
14,400
kWh
$1,836
-
kW-mo/yr
$34
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,123 $477 $2,091
62,211
kWh
- $32
05 2.4239: Eliminate or reduce compressed air usage $1,437 $742 $1,416
42,786
kWh
- $21
06 2.7261: Install timers and/or thermostats $494 $708 $487
15,165
kWh
- $7
TOTAL RECOMMENDED $35,460 $7,683 $6,653
200,473
kWh
$28,282
-
kW-mo/yr
$525
TOTAL IMPLEMENTED $14,252 $6,233 $4,750
142,522
kWh
$9,290
-
kW-mo/yr
$212
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs