Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

60

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Structural clay products, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0609 #05 Y:2021 Reduce illumination to minimum necessary levels $308 $920
SD0609 #04 Y:2021 Utilize higher efficiency lamps and/or ballasts $1,216 $2,319
SD0609 #03 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $1,053 $225
SD0609 #02 Y:2021 Reduce the pressure of compressed air to the minimum required $821 -
SD0609 #01 Y:2021 Utilize energy-efficient belts and other improved mechanisms $1,886 $1,396
LL0325 #07 Y:2009 Use photocell controls $39 $30
LL0325 #06 Y:2009 Install occupancy sensors $114 $120
LL0325 #05 Y:2009 Conserve energy by efficient use of vending machines $803 $623
LL0325 #04 Y:2009 Eliminate leaks in inert gas and compressed air lines/ valves $1,019 $1,265
LL0325 #03 Y:2009 Utilize higher efficiency lamps and/or ballasts $1,166 $595
LL0325 #02 Y:2009 Reduce illumination to minimum necessary levels $1,692 $30
LL0325 #01 Y:2009 Reduce space conditioning during non-working hours $40,139 $3,000
SD0317 #07 Y:2002 Install equipment (eg compactor) to reduce disposal costs $10,800 $10,000
SD0317 #06 Y:2002 Install skylights $1,552 $600
SD0317 #05 Y:2002 Use adjustable frequency drive or multiple speed motors on existing system $2,481 $4,500
SD0317 #04 Y:2002 Eliminate leaks in inert gas and compressed air lines/ valves $2,969 $200
SD0317 #03 Y:2002 Turn off equipment when not in use $4,354 $16
SD0317 #02 Y:2002 Use adjustable frequency drive or multiple speed motors on existing system $7,972 $15,200
SD0317 #01 Y:2002 Upgrade obsolete equipment $18,680 $350
UD0636 #10 Y:2001 Eliminate leaks in inert gas and compressed air lines/ valves $736 $300