ITAC Assessment: LL0325
ITAC logo
ITAC Assessment: LL0325
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Reactive Armor Tiles
NAICS 325920: Explosives Manufacturing
SIC 3259: Structural Clay Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 40
Plant Area 66,000
ft2
Annual Production 11,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $133,593 1,158,633
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,972 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,850

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings
01 2.7224: Reduce space conditioning during non-working hours $40,139 $3,000 $40,139
349,400
kWh
-
02 2.7111: Reduce illumination to minimum necessary levels $1,692 $30 $1,692
14,728
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,166 $595 $650
5,659
kWh
$516
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,019 $1,265 $1,019
8,870
kWh
-
05 2.6211: Conserve energy by efficient use of vending machines $803 $623 $803
6,949
kWh
-
06 2.7135: Install occupancy sensors $114 $120 $114
990
kWh
-
07 2.7134: Use photocell controls $39 $30 $39
341
kWh
-
TOTAL RECOMMENDED $44,972 $5,663 $44,456
386,937
kWh
$516
TOTAL IMPLEMENTED $42,850 $4,295 $42,850
372,998
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Personnel Changes Savings