Assessment Year | 2003 |
---|---|
Principal Product | Clay Roofing Tile |
NAICS | 327120: Clay Building Material and Refractories Manufacturing |
SIC | 3259: Structural Clay Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
80,000
ft2
|
Annual Production | 2,500,000
pieces
|
Production Hrs. Annual | 6,188
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $289,314 | 2,738,146 |
kWh
|
$0.11 |
Electricity Demand | $72,882 | 6,309 |
kW-mo/yr
|
$11.55 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $48,808 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.4321: Upgrade obsolete equipment | $18,680 | $350 |
$16,190
152,880
kWh
|
$2,490
-
kW-mo/yr
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,972 | $15,200 |
$7,972
75,280
kWh
|
- | - | |
03 | 2.6218: Turn off equipment when not in use | $4,354 | $16 |
$3,761
35,510
kWh
|
$593
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,969 | $200 |
$2,566
24,224
kWh
|
$403
-
kW-mo/yr
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,481 | $4,500 |
$2,481
23,431
kWh
|
- | - | |
06 | 2.7145: Install skylights | $1,552 | $600 |
$1,552
14,651
kWh
|
- | - | |
07 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $10,800 | $10,000 | - | - |
$10,800
-
lb
|
|
TOTAL RECOMMENDED | $48,808 | $30,866 |
$34,522
325,976
kWh
|
$3,486
-
kW-mo/yr
|
$10,800
-
lb
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs