Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

611

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Structural clay products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0676 #08 Y:2024 Eliminate or reduce compressed air usage $49 $140
WV0676 #07 Y:2024 Upgrade controls on compressors $329 $1,415
WV0676 #06 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,979 $653
WV0676 #05 Y:2024 Install occupancy sensors $2,075 $3,893
WV0676 #04 Y:2024 Develop a repair/replace policy $3,482 $1,197
WV0676 #03 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $4,750 $6,504
WV0676 #02 Y:2024 Establish a predictive maintenance program $4,780 $5,200
WV0676 #01 Y:2024 Insulate bare equipment $64,709 $86,472
TT0316 #11 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,763 $1,345
TT0316 #10 Y:2024 Recover waste heat from equipment $5,587 $1,500
TT0316 #09 Y:2024 Reduce the pressure of compressed air to the minimum required $7,504 $60
TT0316 #08 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $10,806 $12,000
TT0316 #07 Y:2024 Turn off equipment when not in use $11,283 $30
TT0316 #06 Y:2024 Utilize energy-efficient belts and other improved mechanisms $17,400 $10,380
TT0316 #05 Y:2024 Close outdoor air dampers during warm-up / cool-down periods $18,330 $3,200
TT0316 #04 Y:2024 Meter waste water $22,342 $10,000
TT0316 #03 Y:2024 Change rate schedules or other changes in utility service $147,843 $200,000
TT0316 #02 Y:2024 Use solar heat to make electricty $259,778 $1,375,785
TT0316 #01 Y:2024 Change rate schedules or other changes in utility service $1,156,718 $75,000
TT0311 #07 Y:2024 Lower temperature during the winter season and vice-versa $510 -