Assessment Year | 2024 |
---|---|
Principal Product | Ceramic Tiles |
NAICS | 327120: Clay Building Material and Refractories Manufacturing |
SIC | 3253: Ceramic Wall and Floor Tile |
Sales Range | $50 M to 100M |
# of Employees | 140 |
Plant Area |
530,000
ft2
|
Annual Production | 45,830,677
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $1,545,569 | 21,626,400 |
kWh
|
$0.071 | |
Electricity Demand | $635,114 | 46,384 |
kW-mo/yr
|
$13.69 | |
Electricity Fees | $(-274,707.0) | - |
|
- | |
Natural Gas | $1,712,608 | 389,642 |
MMBtu
|
$4.40 | |
Waste Disposal Costs | |||||
Water Usage | $40,092 | 10,446 |
Tgal
|
$3.84 | |
Water Disposal | $15,432 | 3,134 |
Tgal
|
$4.92 | |
TOTAL YEARLY COSTS | $3,674,108 | ||||
RECOMMENDED SAVINGS* | $97,489 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $52,706 | $69,233 |
$41,749
583,907
kWh
|
$10,957
-
kW-mo/yr
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $20,187 | $9,000 |
$20,187
282,334
kWh
|
- | - | |
03 | 2.2437: Recover waste heat from equipment | $10,039 | $16,000 | - | - |
$10,039
-
MMBtu
|
|
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,957 | $30 |
$5,957
83,308
kWh
|
- | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,792 | $3,400 |
$5,792
81,008
kWh
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,298 | $1,735 |
$2,298
32,140
kWh
|
- | - | |
07 | 2.7221: Lower temperature during the winter season and vice-versa | $510 | - |
$510
7,132
kWh
|
- | - | |
TOTAL RECOMMENDED | $97,489 | $99,398 |
$76,493
1,069,829
kWh
|
$10,957
-
kW-mo/yr
|
$10,039
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs