Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

235

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Cement, hydraulic
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0680 #07 Y:2025 Use insulation in furnaces to facilitate heating / cooling $3,261 $2,066
SD0680 #06 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $13,594 $7,158
SD0680 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $25 $85
SD0680 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $938 $1,623
SD0680 #03 Y:2025 Use most efficient type of electric motors $68,636 $26,246
SD0680 #02 Y:2025 Use battery storage for demand control $314,069 $13,401
SD0680 #01 Y:2025 Use solar heat to make electricty $24,191 $55,932
AS0571 #07 Y:2024 Install timers on light switches in little used areas $430 $987
AS0571 #06 Y:2024 Use power during off-peak periods $492 $511
AS0571 #05 Y:2024 Utilize energy-efficient belts and other improved mechanisms $5,292 $908
AS0571 #04 Y:2024 Utilize higher efficiency lamps and/or ballasts $16,525 $34,427
AS0571 #03 Y:2024 Pay bills on time to avoid late fees $22,882 $38
AS0571 #02 Y:2024 Upgrade controls on compressors $61,102 $20,000
AS0571 #01 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $81,526 $55,952
UF0582 #12 Y:2022 Level one – add communication using iiot devices to existing control system to modify operations $333,010 -
UF0582 #11 Y:2022 Improve air circulation with destratification fans / other methods $14,868 $12,700
UF0582 #10 Y:2022 Install timers on light switches in little used areas $16,853 $7,275
UF0582 #09 Y:2022 Eliminate or reduce compressed air usage $19,379 -
UF0582 #08 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $22,408 $756
UF0582 #07 Y:2022 Minimize condenser cooling water temperature $32,856 $29,990