ITAC Assessment: UF0582
ITAC logo
ITAC Assessment: UF0582
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Cement
NAICS 327310: Cement Manufacturing
SIC 3241: Cement, Hydraulic
Sales Range $100
M
to 500
M
# of Employees 50
Plant Area 2,940,500
ft2
Annual Production 1,406,896
ton
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $6,367,017 120,383,345
kWh
Electricity Demand $861,386 209,171
kW-mo/yr
Electricity Fees $532,698 -
Natural Gas $5,496,387 1,150,881
MMBtu
TOTAL YEARLY COSTS $13,257,488
RECOMMENDED SAVINGS* $5,965,518 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $636,360

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $3,357,648 $12,825,000 $4,505,000
85,000,000
kWh
$494,160
-
kW-mo/yr
$(-791,512.0)
-
MMBtu
- $(-850,000.0)
02 2.2437: Recover waste heat from equipment $1,189,637 $2,090,000 $780,464
14,725,728
kWh
$101,068
-
kW-mo/yr
$308,105
-
MMBtu
- -
03 2.3191: Use demand controller or load shedder $506,910 $647,662 $446,622
8,426,834
kWh
$60,288
-
kW-mo/yr
- - -
04 2.4133: Use most efficient type of electric motors $226,296 $102,253 $197,058
3,718,082
kWh
$29,238
-
kW-mo/yr
- - -
05 2.2428: Use flue gases in radiant heater for space heating, ovens, etc $207,860 $705,580 $(-17,080.0)
(-322,272)
kWh
$(-2,211.0)
-
kW-mo/yr
$227,151
-
MMBtu
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $37,793 $79,204 $31,478
593,928
kWh
$6,315
-
kW-mo/yr
- - -
07 2.2623: Minimize condenser cooling water temperature $32,856 $29,990 $32,856
619,920
kWh
- - - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $22,408 $756 $22,408
422,794
kWh
- - - -
09 2.4239: Eliminate or reduce compressed air usage $19,379 - $19,379
365,638
kWh
- - - -
10 2.7132: Install timers on light switches in little used areas $16,853 $7,275 $16,853
317,988
kWh
- - - -
11 2.7243: Improve air circulation with destratification fans / other methods $14,868 $12,700 $(-1,339.0)
(-25,272)
kWh
$(-173.0)
-
kW-mo/yr
- $16,380 -
12 4.662: Level one – add communication using iiot devices to existing control system to modify operations $333,010 - - - - - $333,010
TOTAL RECOMMENDED $5,965,518 $16,500,420 $6,033,699
113,843,368
kWh
$688,685
-
kW-mo/yr
$(-256,256.0)
-
MMBtu
$16,380 $(-516,990.0)
TOTAL IMPLEMENTED $636,360 $189,488 $267,797
5,052,792
kWh
$35,553
-
kW-mo/yr
- - $333,010