ITAC Assessment: AS0571
ITAC logo
ITAC Assessment: AS0571
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Portland Cement
NAICS 327310: Cement Manufacturing
SIC 3241: Cement, Hydraulic
Sales Range $50
M
to 100
M
# of Employees 130
Plant Area 1,336,000
ft2
Annual Production 660,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,777,130 85,896,950
kWh
Electricity Demand $1,749,688 298,923
kW-mo/yr
Electricity Fees $24,567 -
Natural Gas $5,718,157 1,794,636
MMBtu
TOTAL YEARLY COSTS $11,269,542
RECOMMENDED SAVINGS* $188,249 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $126,717

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $81,526 $55,952 $68,962
1,567,337
kWh
$12,564
-
kW-mo/yr
- - -
02 2.4224: Upgrade controls on compressors $61,102 $20,000 $51,688
1,174,716
kWh
$9,414
-
kW-mo/yr
- - -
03 4.821: Pay bills on time to avoid late fees $22,882 $38 - - - - $22,882
04 2.7142: Utilize higher efficiency lamps and/or ballasts $16,525 $34,427 $17,070
387,933
kWh
$3,108
-
kW-mo/yr
- $(-3,653.0) -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,292 $908 - - - - $5,292
06 2.3137: Use power during off-peak periods $492 $511 - - $492 - -
07 2.7132: Install timers on light switches in little used areas $430 $987 $430
9,780
kWh
- - - -
TOTAL RECOMMENDED $188,249 $112,823 $138,150
3,139,766
kWh
$25,086
-
kW-mo/yr
$492 $(-3,653.0) $28,174
TOTAL IMPLEMENTED $126,717 $91,836 $86,032
1,955,270
kWh
$15,672
-
kW-mo/yr
$492 $(-3,653.0) $28,174
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs