ITAC Assessment: TN0295
ITAC logo
ITAC Assessment: TN0295
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product HEATERS
NAICS
n/a
SIC 3433: Heating Equipment, Except Electric and Warm Air Furnaces
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area
n/a
Annual Production 150,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $123,095 1,601,114
kWh
Natural Gas $97,303 18,276
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,418 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,233

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7492: Use proper thickness of insulation on building envelope $7,892 $48,000 - $7,892
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $15,368 $750 $15,368
199,590
kWh
-
03 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $12,728 $2,700 $12,728
165,299
kWh
-
04 2.6232: Install set-back timers $3,137 - $3,137
40,739
kWh
-
05 2.6212: Turn off equipment during breaks, reduce operating time $293 - $293
3,810
kWh
-
TOTAL RECOMMENDED $39,418 $51,450 $31,526
409,438
kWh
$7,892
-
MMBtu
TOTAL IMPLEMENTED $31,233 $3,450 $31,233
405,628
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs