Assessment Year | 1986 |
---|---|
Principal Product | HEATERS |
NAICS |
n/a
|
SIC | 3433: Heating Equipment, Except Electric and Warm Air Furnaces |
Sales Range | $10 M to 50M |
# of Employees | 400 |
Plant Area |
n/a
|
Annual Production | 150,000
pieces
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $123,095 | 1,601,114 |
kWh
|
$0.077 |
Natural Gas | $97,303 | 18,276 |
MMBtu
|
$5.32 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $39,418 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $31,233 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7492: Use proper thickness of insulation on building envelope | $7,892 | $48,000 | - |
$7,892
-
MMBtu
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $15,368 | $750 |
$15,368
199,590
kWh
|
- | |
03 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $12,728 | $2,700 |
$12,728
165,299
kWh
|
- | |
04 | 2.6232: Install set-back timers | $3,137 | - |
$3,137
40,739
kWh
|
- | |
05 | 2.6212: Turn off equipment during breaks, reduce operating time | $293 | - |
$293
3,810
kWh
|
- | |
TOTAL RECOMMENDED | $39,418 | $51,450 |
$31,526
409,438
kWh
|
$7,892
-
MMBtu
|
||
TOTAL IMPLEMENTED | $31,233 | $3,450 |
$31,233
405,628
kWh
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs