67
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Pressed and blown glass and glassware, not elsewhere classified | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WV0151 #06 Y:1998 | 06 | 1998 | Insulate bare equipment | $611 | $83 | |
| WV0151 #05 Y:1998 | 05 | 1998 | Burn a less expensive grade of fuel | $1,820 | $2,400 | |
| WV0151 #04 Y:1998 | 04 | 1998 | Cover open tanks | $18,688 | $3,164 | |
| WV0151 #03 Y:1998 | 03 | 1998 | Recover waste heat from equipment | $4,914 | $1,890 | |
| WV0151 #02 Y:1998 | 02 | 1998 | Utilize energy-efficient belts and other improved mechanisms | $82 | $100 | |
| WV0151 #01 Y:1998 | 01 | 1998 | Utilize higher efficiency lamps and/or ballasts | $413 | $281 | |
| WV0142 #11 Y:1998 | 11 | 1998 | Cross-train personnel to avoid lost time | $29,750 | $500 | |
| WV0142 #10 Y:1998 | 10 | 1998 | Lease / purchase baler; sell cardboard to recycler | $960 | $100 | |
| WV0142 #09 Y:1998 | 09 | 1998 | Install equipment (eg compactor) to reduce disposal costs | $1,076 | $11,000 | |
| WV0142 #08 Y:1998 | 08 | 1998 | Utilize higher efficiency lamps and/or ballasts | $139 | $126 | |
| WV0142 #07 Y:1998 | 07 | 1998 | Insulate bare equipment | $3,358 | $1,330 | |
| WV0142 #06 Y:1998 | 06 | 1998 | Install compressor air intakes in coolest locations | $51 | $88 | |
| WV0142 #05 Y:1998 | 05 | 1998 | Recover waste heat from equipment | $1,509 | $605 | |
| WV0142 #04 Y:1998 | 04 | 1998 | Reduce the pressure of compressed air to the minimum required | $14 | $10 | |
| WV0142 #03 Y:1998 | 03 | 1998 | Use flow control valves on equipment to optimize water use | $152 | $316 | |
| WV0142 #02 Y:1998 | 02 | 1998 | Cover open tanks | $387 | $1,056 | |
| WV0142 #01 Y:1998 | 01 | 1998 | Preheat combustion air with waste heat | $1,491 | $1,400 | |
| WV0084 #10 Y:1995 | 10 | 1995 | Use closed cycle process to minimize waste water production | $3,712 | $5,120 | |
| WV0084 #09 Y:1995 | 09 | 1995 | Insulate bare equipment | $331 | $453 | |
| WV0084 #08 Y:1995 | 08 | 1995 | Use waste heat from hot flue gases to preheat | $646 | $1,450 |