Assessment Year | 1996 |
---|---|
Principal Product | Glass giftware |
NAICS |
n/a
|
SIC | 3229: Pressed and Blown Glass and Glassware, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 435 |
Plant Area |
290,000
ft2
|
Annual Production | 7,000,000
lb
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $129,667 | 4,579,719 |
kWh
|
$0.028 |
Electricity Demand | $95,110 | 10,671 |
kW-mo/yr
|
$8.91 |
Electricity Fees | $8,490 | - |
|
- |
Natural Gas | $871,856 | 411,026 |
MMBtu
|
$2.12 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $15,328 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,852 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7111: Reduce illumination to minimum necessary levels | $1,160 | $800 |
$1,160
41,032
kWh
|
- | - | - | - | |
02 | 2.4133: Use most efficient type of electric motors | $570 | $10,840 |
$570
19,930
kWh
|
- | - | - | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $746 | $2,000 |
$746
26,377
kWh
|
- | - | - | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $480 | $275 |
$480
16,999
kWh
|
- | - | - | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $907 | $40 |
$907
14,947
kWh
|
- | - | - | - | |
06 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $6,138 | - | - |
$6,138
-
kW-mo/yr
|
- | - | - | |
07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $638 | $1,000 | - | - |
$638
-
MMBtu
|
- | - | |
08 | 2.2414: Use waste heat from hot flue gases to preheat | $646 | $1,450 | - | - |
$646
-
MMBtu
|
- | - | |
09 | 2.2511: Insulate bare equipment | $331 | $453 | - | - |
$331
-
MMBtu
|
- | - | |
10 | 3.4111: Use closed cycle process to minimize waste water production | $3,712 | $5,120 |
$(-28.0)
(-1,172)
kWh
|
- | - |
$4,000
-
Tgal
|
$(-260.0) | |
TOTAL RECOMMENDED | $15,328 | $21,978 |
$3,835
118,113
kWh
|
$6,138
-
kW-mo/yr
|
$1,615
-
MMBtu
|
$4,000
-
Tgal
|
$(-260.0) | ||
TOTAL IMPLEMENTED | $9,852 | $14,133 |
$3,383
102,286
kWh
|
$6,138
-
kW-mo/yr
|
$331
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs