ITAC Assessment: WV0084
ITAC logo
ITAC Assessment: WV0084
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Glass giftware
NAICS
n/a
SIC 3229: Pressed and Blown Glass and Glassware, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 435
Plant Area 290,000
ft2
Annual Production 7,000,000
lb
Production Hrs. Annual 4,000
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $129,667 4,579,719
kWh
Electricity Demand $95,110 10,671
kW-mo/yr
Electricity Fees $8,490 -
Natural Gas $871,856 411,026
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,328 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,852

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Ancillary Material Cost Savings
01 2.7111: Reduce illumination to minimum necessary levels $1,160 $800 $1,160
41,032
kWh
- - - -
02 2.4133: Use most efficient type of electric motors $570 $10,840 $570
19,930
kWh
- - - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $746 $2,000 $746
26,377
kWh
- - - -
04 2.4221: Install compressor air intakes in coolest locations $480 $275 $480
16,999
kWh
- - - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $907 $40 $907
14,947
kWh
- - - -
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $6,138 - - $6,138
-
kW-mo/yr
- - -
07 2.1233: Analyze flue gas for proper air/fuel ratio $638 $1,000 - - $638
-
MMBtu
- -
08 2.2414: Use waste heat from hot flue gases to preheat $646 $1,450 - - $646
-
MMBtu
- -
09 2.2511: Insulate bare equipment $331 $453 - - $331
-
MMBtu
- -
10 3.4111: Use closed cycle process to minimize waste water production $3,712 $5,120 $(-28.0)
(-1,172)
kWh
- - $4,000
-
Tgal
$(-260.0)
TOTAL RECOMMENDED $15,328 $21,978 $3,835
118,113
kWh
$6,138
-
kW-mo/yr
$1,615
-
MMBtu
$4,000
-
Tgal
$(-260.0)
TOTAL IMPLEMENTED $9,852 $14,133 $3,383
102,286
kWh
$6,138
-
kW-mo/yr
$331
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs