ITAC Assessment: AM0207
ITAC logo
ITAC Assessment: AM0207
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Heat exchanger and hydraulic fin tubing
NAICS
n/a
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area 61,000
ft2
Annual Production 2,510,000
thousand feet
Production Hrs. Annual 6,288
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $82,695 977,140
kWh
Natural Gas $28,371 5,009
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,400 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings Primary Raw Material Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $34,600 - n/a - - $34,600
02 3.1191: Change procedures / equipment / operating conditions $1,090 $600 n/a - - $1,090
03 2.8118: Check for accuracy of utility / power meters $6,600 $700 n/a $6,600
134,818
kWh
- -
04 2.8123: Pay utility bills on time $5,400 - n/a - $5,400 -
05 2.4133: Use most efficient type of electric motors $3,990 $4,300 n/a - $3,990 -
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,150 - n/a - $2,150 -
07 2.7124: Make a practice of turning off lights when not needed $700 $1,220 n/a $700
10,258
kWh
- -
08 2.3131: Reschedule plant operations or reduce load to avoid peaks $640 - n/a $640
-
kWh
- -
09 3.5311: Recover and reuse waste material $230 $80 n/a $230
2,931
kWh
- -
TOTAL RECOMMENDED $55,400 $6,900 $8,170
148,007
kWh
$11,540 $35,690
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs