Assessment Year | 1994 |
---|---|
Principal Product | Heat exchanger and hydraulic fin tubing |
NAICS |
n/a
|
SIC | 3498: Fabricated Pipe and Pipe Fittings |
Sales Range | $1 M to 5M |
# of Employees | 30 |
Plant Area |
61,000
ft2
|
Annual Production | 2,510,000
thousand feet
|
Production Hrs. Annual | 6,288
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $82,695 | 977,140 |
kWh
|
$0.085 |
Natural Gas | $28,371 | 5,009 |
MMBtu
|
$5.66 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $55,400 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $34,600 | - | n/a | - | - | $34,600 |
02 | 3.1191: Change procedures / equipment / operating conditions | $1,090 | $600 | n/a | - | - | $1,090 |
03 | 2.8118: Check for accuracy of utility / power meters | $6,600 | $700 | n/a |
$6,600
134,818
kWh
|
- | - |
04 | 2.8123: Pay utility bills on time | $5,400 | - | n/a | - | $5,400 | - |
05 | 2.4133: Use most efficient type of electric motors | $3,990 | $4,300 | n/a | - | $3,990 | - |
06 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,150 | - | n/a | - | $2,150 | - |
07 | 2.7124: Make a practice of turning off lights when not needed | $700 | $1,220 | n/a |
$700
10,258
kWh
|
- | - |
08 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $640 | - | n/a |
$640
-
kWh
|
- | - |
09 | 3.5311: Recover and reuse waste material | $230 | $80 | n/a |
$230
2,931
kWh
|
- | - |
TOTAL RECOMMENDED | $55,400 | $6,900 |
$8,170
148,007
kWh
|
$11,540 | $35,690 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs