Assessment Year | 1998 |
---|---|
Principal Product | Hand made lamp parts |
NAICS |
n/a
|
SIC | 3229: Pressed and Blown Glass and Glassware, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 70 |
Plant Area |
100,000
ft2
|
Annual Production | 1,500
ton
|
Production Hrs. Annual | 2,125
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $36,938 | 604,924 |
kWh
|
$0.061 |
Natural Gas | $209,732 | 141,028 |
MMBtu
|
$1.49 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $38,887 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $34,272 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2442: Preheat combustion air with waste heat | $1,491 | $1,400 | - |
$1,491
-
MMBtu
|
- | - | |
02 | 2.2514: Cover open tanks | $387 | $1,056 | - |
$387
-
MMBtu
|
- | - | |
03 | 3.4156: Use flow control valves on equipment to optimize water use | $152 | $316 | - |
$152
-
MMBtu
|
- | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $14 | $10 |
$14
293
kWh
|
- | - | - | |
05 | 2.2437: Recover waste heat from equipment | $1,509 | $605 | - |
$1,509
-
MMBtu
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $51 | $88 |
$51
879
kWh
|
- | - | - | |
07 | 2.2511: Insulate bare equipment | $3,358 | $1,330 | - |
$3,358
-
MMBtu
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $139 | $126 |
$139
2,345
kWh
|
- | - | - | |
09 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $1,076 | $11,000 | - | - |
$1,076
-
lb
|
- | |
10 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $960 | $100 | - | - |
$960
-
lb
|
- | |
11 | 4.432: Cross-train personnel to avoid lost time | $29,750 | $500 | - | - | - | $29,750 | |
TOTAL RECOMMENDED | $38,887 | $16,531 |
$204
3,517
kWh
|
$6,897
-
MMBtu
|
$2,036
-
lb
|
$29,750 | ||
TOTAL IMPLEMENTED | $34,272 | $2,154 |
$204
3,517
kWh
|
$3,358
-
MMBtu
|
$960
-
lb
|
$29,750 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs