Assessment Year | 1998 |
---|---|
Principal Product | Hand made glass |
NAICS |
n/a
|
SIC | 3229: Pressed and Blown Glass and Glassware, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 75 |
Plant Area |
52,322
ft2
|
Annual Production | 322,000
pieces
|
Production Hrs. Annual | 3,600
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $62,921 | 1,351,407 |
kWh
|
$0.047 |
Natural Gas | $425,808 | 134,796 |
MMBtu
|
$3.16 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $68,730 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,650 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $413 | $281 |
$413
11,723
kWh
|
- | - | - | - | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $82 | $100 |
$82
1,758
kWh
|
- | - | - | - | - | |
03 | 2.2437: Recover waste heat from equipment | $4,914 | $1,890 | - |
$4,914
-
MMBtu
|
- | - | - | - | |
04 | 2.2514: Cover open tanks | $18,688 | $3,164 | - |
$18,688
-
MMBtu
|
- | - | - | - | |
05 | 2.1331: Burn a less expensive grade of fuel | $1,820 | $2,400 | - | - |
$1,820
-
MMBtu
|
- | - | - | |
06 | 2.2511: Insulate bare equipment | $611 | $83 | - |
$611
-
MMBtu
|
- | - | - | - | |
07 | 2.4314: Use synthetic lubricant | $124 | $213 |
$124
2,931
kWh
|
- | - | - | - | - | |
08 | 2.4133: Use most efficient type of electric motors | $970 | $2,310 |
$970
61,547
kWh
|
- | - | - | - | - | |
09 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $10,408 | $11,000 | - | - | - | - |
$10,408
-
lb
|
- | |
10 | 3.4111: Use closed cycle process to minimize waste water production | $1,450 | $326 | - | - | - |
$1,450
-
Tgal
|
- | - | |
11 | 4.432: Cross-train personnel to avoid lost time | $29,250 | $45 | - | - | - | - | - | $29,250 | |
TOTAL RECOMMENDED | $68,730 | $21,812 |
$1,589
77,959
kWh
|
$24,213
-
MMBtu
|
$1,820
-
MMBtu
|
$1,450
-
Tgal
|
$10,408
-
lb
|
$29,250 | ||
TOTAL IMPLEMENTED | $3,650 | $3,313 |
$1,589
77,959
kWh
|
$611
-
MMBtu
|
- |
$1,450
-
Tgal
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs