ITAC Assessment: UF0570
ITAC logo
ITAC Assessment: UF0570
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Wastewater Treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $1
M
to 5
M
# of Employees 15
Plant Area 333,900
ft2
Annual Production 4,999,150
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $640,333 16,696,800
kWh
Electricity Demand $243,999 31,652
kW-mo/yr
Electricity Fees $25,924 -
TOTAL YEARLY COSTS $910,256
RECOMMENDED SAVINGS* $206,068 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $184,778

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.3191: Use demand controller or load shedder $61,494 $87,677 $44,413
1,168,776
kWh
$17,081
-
kW-mo/yr
- -
02 2.4112: Install soft-start to eliminate nuisance trips $15,702 $33,667 $15,702
413,200
kWh
- - -
03 2.6231: Utilize controls to operate equipment only when needed $12,945 $20,214 $12,945
340,671
kWh
- - -
04 2.4133: Use most efficient type of electric motors $12,034 $32,610 $7,885
207,507
kWh
$4,149
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $11,674 $35,369 $7,061
185,817
kWh
$4,613
-
kW-mo/yr
- -
06 2.7135: Install occupancy sensors $4,026 $12,390 $4,026
105,954
kWh
- - -
07 4.661: Level zero – install control systems for existing equipment $63,448 $10,000 $63,448
1,669,680
kWh
- - -
08 4.446: Automate finishing process $17,264 $3,564 - - - $17,264
09 4.662: Level one – add communication using iiot devices to existing control system to modify operations $7,481 - - - $7,481 -
TOTAL RECOMMENDED $206,068 $235,491 $155,480
4,091,605
kWh
$25,843
-
kW-mo/yr
$7,481 $17,264
TOTAL IMPLEMENTED $184,778 $219,537 $151,454
3,985,651
kWh
$25,843
-
kW-mo/yr
$7,481 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs