| Assessment Year | 2022 |
|---|---|
| Principal Product | Wastewater Treatment |
| NAICS | 221320: Sewage Treatment Facilities |
| SIC | 4952: Sewerage Systems |
| Sales Range | $1 M to 5M |
| # of Employees | 15 |
| Plant Area |
333,900
ft2
|
| Annual Production | 4,999,150
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $640,333 | 16,696,800 |
kWh
|
$0.038 |
| Electricity Demand | $243,999 | 31,652 |
kW-mo/yr
|
$7.71 |
| Electricity Fees | $25,924 | - |
|
- |
| TOTAL YEARLY COSTS | $910,256 | |||
| RECOMMENDED SAVINGS* | $206,068 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $184,778 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.3191: Use demand controller or load shedder | $61,494 | $87,677 |
$44,413
1,168,776
kWh
|
$17,081
-
kW-mo/yr
|
- | - | |
| 02 | 2.4112: Install soft-start to eliminate nuisance trips | $15,702 | $33,667 |
$15,702
413,200
kWh
|
- | - | - | |
| 03 | 2.6231: Utilize controls to operate equipment only when needed | $12,945 | $20,214 |
$12,945
340,671
kWh
|
- | - | - | |
| 04 | 2.4133: Use most efficient type of electric motors | $12,034 | $32,610 |
$7,885
207,507
kWh
|
$4,149
-
kW-mo/yr
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,674 | $35,369 |
$7,061
185,817
kWh
|
$4,613
-
kW-mo/yr
|
- | - | |
| 06 | 2.7135: Install occupancy sensors | $4,026 | $12,390 |
$4,026
105,954
kWh
|
- | - | - | |
| 07 | 4.661: Level zero – install control systems for existing equipment | $63,448 | $10,000 |
$63,448
1,669,680
kWh
|
- | - | - | |
| 08 | 4.446: Automate finishing process | $17,264 | $3,564 | - | - | - | $17,264 | |
| 09 | 4.662: Level one – add communication using iiot devices to existing control system to modify operations | $7,481 | - | - | - | $7,481 | - | |
| TOTAL RECOMMENDED | $206,068 | $235,491 |
$155,480
4,091,605
kWh
|
$25,843
-
kW-mo/yr
|
$7,481 | $17,264 | ||
| TOTAL IMPLEMENTED | $184,778 | $219,537 |
$151,454
3,985,651
kWh
|
$25,843
-
kW-mo/yr
|
$7,481 | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Primary Raw Material Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs