Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

113

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Glass containers
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK0981 #06 Y:2017 Optimize plant power factor $11,423 $50,570
OK0981 #05 Y:2017 Install waste heat boiler to provide direct power $353,111 $2,500,000
OK0981 #04 Y:2017 Utilize higher efficiency lamps and/or ballasts $21,343 $69,050
OK0981 #03 Y:2017 Install compressor air intakes in coolest locations $16,309 $4,937
OK0981 #02 Y:2017 Reduce the pressure of compressed air to the minimum required $7,815 -
OK0981 #01 Y:2017 Upgrade controls on compressors $124,716 $75,000
DL0169 #06 Y:2016 Use adjustable frequency drive or multiple speed motors on existing system $300,500 $1,937,040
DL0169 #05 Y:2016 Insulate bare equipment $11,160 $11,160
DL0169 #04 Y:2016 Use hot process fluids to preheat incoming process fluids $5,060 $5,000
DL0169 #03 Y:2016 Adjust burners for efficient operation $117,000 $34,000
DL0169 #02 Y:2016 Keep equipment clean $13,120 $2,500
DL0169 #01 Y:2016 Use waste heat from hot flue gases to preheat incoming fluids $163,600 $12,000
LE0396 #10 Y:2015 Replace boiler $4,068 $18,400
LE0396 #09 Y:2015 Utilize higher efficiency lamps and/or ballasts $3,431 $13,983
LE0396 #08 Y:2015 Reduce the pressure of compressed air to the minimum required $2,304 $9,400
LE0396 #07 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $405 $1,000
LE0396 #06 Y:2015 Recover waste heat from equipment $1,473 $1,950
LE0396 #05 Y:2015 Install / repair insulation on steam lines $1,534 $1,644
LE0396 #04 Y:2015 Utilize energy-efficient belts and other improved mechanisms $214 $105
LE0396 #03 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $8,080 $2,845