Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Flat glass
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0510 #09 Y:2021 Use solar heat to make electricty $1,245,175 $9,990,000
LE0510 #08 Y:2021 Replace boiler $334,294 $1,800,000
LE0510 #07 Y:2021 Utilize higher efficiency lamps and/or ballasts $22,653 $100,000
LE0510 #06 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $4,899 $12,800
LE0510 #05 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $19,596 $33,000
LE0510 #04 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $19,170 $21,000
LE0510 #03 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $31,951 $30,000
LE0510 #02 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $47,926 $45,000
LE0510 #01 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $42,017 $17,100
WV0167 #08 Y:1999 Purchase appropriately sized material $4,160 -
WV0167 #07 Y:1999 Install refrigeration system to cool product $12,120 $800
WV0167 #06 Y:1999 Install equipment (eg compactor) to reduce disposal costs $804 $5,500
WV0167 #05 Y:1999 Replace electrically-operated equipment with fossil fuel equipment $11,784 $10,000
WV0167 #04 Y:1999 Burn a less expensive grade of fuel $22,359 $12,500
WV0167 #03 Y:1999 Insulate bare equipment $5,901 $606
WV0167 #02 Y:1999 Install occupancy sensors $809 $315
WV0167 #01 Y:1999 Analyze flue gas for proper air/fuel ratio $12,173 $1,000
WV0152 #10 Y:1998 Re-arrange equipment layout to reduce handling costs $24,414 $3,000
WV0152 #09 Y:1998 Recycle fluorescent lamps $400 $45
WV0152 #08 Y:1998 Contract a wood pallet recycling company $960 $50