27
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Flat glass | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| LE0510 #09 Y:2021 | 09 | 2021 | Use solar heat to make electricty | $1,245,175 | $9,990,000 | |
| LE0510 #08 Y:2021 | 08 | 2021 | Replace boiler | $334,294 | $1,800,000 | |
| LE0510 #07 Y:2021 | 07 | 2021 | Utilize higher efficiency lamps and/or ballasts | $22,653 | $100,000 | |
| LE0510 #06 Y:2021 | 06 | 2021 | Use adjustable frequency drive or multiple speed motors on existing system | $4,899 | $12,800 | |
| LE0510 #05 Y:2021 | 05 | 2021 | Use adjustable frequency drive or multiple speed motors on existing system | $19,596 | $33,000 | |
| LE0510 #04 Y:2021 | 04 | 2021 | Use adjustable frequency drive or multiple speed motors on existing system | $19,170 | $21,000 | |
| LE0510 #03 Y:2021 | 03 | 2021 | Use adjustable frequency drive or multiple speed motors on existing system | $31,951 | $30,000 | |
| LE0510 #02 Y:2021 | 02 | 2021 | Use adjustable frequency drive or multiple speed motors on existing system | $47,926 | $45,000 | |
| LE0510 #01 Y:2021 | 01 | 2021 | Eliminate leaks in inert gas and compressed air lines/ valves | $42,017 | $17,100 | |
| WV0167 #08 Y:1999 | 08 | 1999 | Purchase appropriately sized material | $4,160 | - | |
| WV0167 #07 Y:1999 | 07 | 1999 | Install refrigeration system to cool product | $12,120 | $800 | |
| WV0167 #06 Y:1999 | 06 | 1999 | Install equipment (eg compactor) to reduce disposal costs | $804 | $5,500 | |
| WV0167 #05 Y:1999 | 05 | 1999 | Replace electrically-operated equipment with fossil fuel equipment | $11,784 | $10,000 | |
| WV0167 #04 Y:1999 | 04 | 1999 | Burn a less expensive grade of fuel | $22,359 | $12,500 | |
| WV0167 #03 Y:1999 | 03 | 1999 | Insulate bare equipment | $5,901 | $606 | |
| WV0167 #02 Y:1999 | 02 | 1999 | Install occupancy sensors | $809 | $315 | |
| WV0167 #01 Y:1999 | 01 | 1999 | Analyze flue gas for proper air/fuel ratio | $12,173 | $1,000 | |
| WV0152 #10 Y:1998 | 10 | 1998 | Re-arrange equipment layout to reduce handling costs | $24,414 | $3,000 | |
| WV0152 #09 Y:1998 | 09 | 1998 | Recycle fluorescent lamps | $400 | $45 | |
| WV0152 #08 Y:1998 | 08 | 1998 | Contract a wood pallet recycling company | $960 | $50 |