Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Architectural Glass
NAICS 327211: Flat Glass Manufacturing
SIC 3211: Flat Glass
Sales Range $100
M
to 500
M
# of Employees 150
Plant Area 1,400,000
ft2
Annual Production 383,000
thousand feet
Production Hrs. Annual 8,736
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $5,787,619 125,907,600
kWh
Electricity Demand $47,851 218,363
kW-mo/yr
Electricity Fees $211,969 -
Natural Gas $6,523,175 2,818,720
MMBtu
TOTAL YEARLY COSTS $12,570,614
RECOMMENDED SAVINGS* $1,767,681 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $502,910

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $42,017 $17,100 $41,743
907,460
kWh
$274
-
kW-mo/yr
- - - -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $47,926 $45,000 $47,613
1,035,061
kWh
$313
-
kW-mo/yr
- - - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $31,951 $30,000 $31,742
690,041
kWh
$209
-
kW-mo/yr
- - - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $19,170 $21,000 $19,045
414,025
kWh
$125
-
kW-mo/yr
- - - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $19,596 $33,000 $19,468
423,226
kWh
$128
-
kW-mo/yr
- - - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,899 $12,800 $4,867
105,805
kWh
$32
-
kW-mo/yr
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $22,653 $100,000 $22,505
489,216
kWh
$148
-
kW-mo/yr
- - - -
08 2.1224: Replace boiler $334,294 $1,800,000 - - $294,294
-
MMBtu
- - $40,000
09 2.9114: Use solar heat to make electricty $1,245,175 $9,990,000 $721,655
15,688,152
kWh
- - $627,520 $(-104,000.0) -
TOTAL RECOMMENDED $1,767,681 $12,048,900 $908,638
19,752,986
kWh
$1,229
-
kW-mo/yr
$294,294
-
MMBtu
$627,520 $(-104,000.0) $40,000
TOTAL IMPLEMENTED $502,910 $2,025,900 $167,515
3,641,608
kWh
$1,101
-
kW-mo/yr
$294,294
-
MMBtu
- - $40,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings