ITAC Assessment: WV0167
ITAC logo
ITAC Assessment: WV0167
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Decorative glass
NAICS
n/a
SIC 3211: Flat Glass
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area 25,000
ft2
Annual Production 1,000
thousand feet
Production Hrs. Annual 4,335
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $18,416 285,756
kWh
Natural Gas $41,769 7,832
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $70,110 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,194

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings LPG Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $12,173 $1,000 - $12,173
-
MMBtu
- - -
02 2.7135: Install occupancy sensors $809 $315 $809
12,603
kWh
- - - -
03 2.2511: Insulate bare equipment $5,901 $606 - $5,901
-
MMBtu
- - -
04 2.1331: Burn a less expensive grade of fuel $22,359 $12,500 - $(-27,730.0)
-
MMBtu
$50,089
-
MMBtu
- -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $11,784 $10,000 - - - - $11,784
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $804 $5,500 - - - $804
-
lb
-
07 4.113: Install refrigeration system to cool product $12,120 $800 - - - - $12,120
08 4.214: Purchase appropriately sized material $4,160 - - - - - $4,160
TOTAL RECOMMENDED $70,110 $30,721 $809
12,603
kWh
$(-9,656.0)
-
MMBtu
$50,089
-
MMBtu
$804
-
lb
$28,064
TOTAL IMPLEMENTED $30,194 $2,406 - $18,074
-
MMBtu
- - $12,120
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings LPG Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs