ITAC Assessment: WV0152
ITAC logo
ITAC Assessment: WV0152
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Flat glass
NAICS
n/a
SIC 3211: Flat Glass
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 225,000
ft2
Annual Production 500
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $329,041 8,627,198
kWh
Electricity Demand $223,882 20,675
kW-mo/yr
Electricity Fees $11,261 -
Natural Gas $132,021 35,163
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,362 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,815

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Gas Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Administrative Changes Savings
01 2.7241: Install outside air damper / economizer on hvac unit $6,254 $2,580 $6,254
158,558
kWh
- - - - -
02 2.1233: Analyze flue gas for proper air/fuel ratio $758 $700 - $758
-
MMBtu
- - - -
03 2.2414: Use waste heat from hot flue gases to preheat $5,558 $2,600 - $5,558
-
MMBtu
- - - -
04 2.2511: Insulate bare equipment $447 $171 - $447
-
MMBtu
- - - -
05 2.2511: Insulate bare equipment $236 $732 - $236
-
MMBtu
- - - -
06 2.2437: Recover waste heat from equipment $1,785 $1,355 - $1,785
-
MMBtu
- - - -
07 2.1331: Burn a less expensive grade of fuel $9,550 $8,400 - - $9,550
-
MMBtu
- - -
08 3.5316: Contract a wood pallet recycling company $960 $50 - - - $960
-
lb
- -
09 3.5318: Recycle fluorescent lamps $400 $45 - - - - $400
-
lb
-
10 4.514: Re-arrange equipment layout to reduce handling costs $24,414 $3,000 - - - - - $24,414
TOTAL RECOMMENDED $50,362 $19,633 $6,254
158,558
kWh
$8,784
-
MMBtu
$9,550
-
MMBtu
$960
-
lb
$400
-
lb
$24,414
TOTAL IMPLEMENTED $26,815 $4,653 - $1,441
-
MMBtu
- $960
-
lb
- $24,414
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Gas Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs