| Assessment Year | 1998 |
|---|---|
| Principal Product | Flat glass |
| NAICS |
n/a
|
| SIC | 3211: Flat Glass |
| Sales Range | $10 M to 50M |
| # of Employees | 110 |
| Plant Area |
225,000
ft2
|
| Annual Production | 500
thousand feet
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $329,041 | 8,627,198 |
kWh
|
$0.038 |
| Electricity Demand | $223,882 | 20,675 |
kW-mo/yr
|
$10.83 |
| Electricity Fees | $11,261 | - |
|
- |
| Natural Gas | $132,021 | 35,163 |
MMBtu
|
$3.75 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $50,362 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $26,815 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Gas Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7241: Install outside air damper / economizer on hvac unit | $6,254 | $2,580 |
$6,254
158,558
kWh
|
- | - | - | - | - | |
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $758 | $700 | - |
$758
-
MMBtu
|
- | - | - | - | |
| 03 | 2.2414: Use waste heat from hot flue gases to preheat | $5,558 | $2,600 | - |
$5,558
-
MMBtu
|
- | - | - | - | |
| 04 | 2.2511: Insulate bare equipment | $447 | $171 | - |
$447
-
MMBtu
|
- | - | - | - | |
| 05 | 2.2511: Insulate bare equipment | $236 | $732 | - |
$236
-
MMBtu
|
- | - | - | - | |
| 06 | 2.2437: Recover waste heat from equipment | $1,785 | $1,355 | - |
$1,785
-
MMBtu
|
- | - | - | - | |
| 07 | 2.1331: Burn a less expensive grade of fuel | $9,550 | $8,400 | - | - |
$9,550
-
MMBtu
|
- | - | - | |
| 08 | 3.5316: Contract a wood pallet recycling company | $960 | $50 | - | - | - |
$960
-
lb
|
- | - | |
| 09 | 3.5318: Recycle fluorescent lamps | $400 | $45 | - | - | - | - |
$400
-
lb
|
- | |
| 10 | 4.514: Re-arrange equipment layout to reduce handling costs | $24,414 | $3,000 | - | - | - | - | - | $24,414 | |
| TOTAL RECOMMENDED | $50,362 | $19,633 |
$6,254
158,558
kWh
|
$8,784
-
MMBtu
|
$9,550
-
MMBtu
|
$960
-
lb
|
$400
-
lb
|
$24,414 | ||
| TOTAL IMPLEMENTED | $26,815 | $4,653 | - |
$1,441
-
MMBtu
|
- |
$960
-
lb
|
- | $24,414 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Gas Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs