ITAC Assessment: UD0986
ITAC logo
ITAC Assessment: UD0986
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Molded Rubber Goods
NAICS 326299: All Other Rubber Product Manufacturing
SIC 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods
Sales Range $5
M
to 10
M
# of Employees 120
Plant Area 19,200
ft2
Annual Production 173,452
units
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $149,528 2,254,644
kWh
Electricity Demand $2,129 364
kW-mo/yr
Electricity Fees $37,278 -
Natural Gas $3,378 423
MMBtu
Waste Disposal Costs
Water Usage $2,101 409
Tgal
Water Disposal $540 409
Tgal
TOTAL YEARLY COSTS $194,954
RECOMMENDED SAVINGS* $98,988 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $28,289 - $28,289
426,563
kWh
-
02 2.6212: Turn off equipment during breaks, reduce operating time $8,337 - $8,337
125,705
kWh
-
03 2.6218: Turn off equipment when not in use $37,147 - $36,063
543,775
kWh
$1,084
-
kW-mo/yr
04 2.6212: Turn off equipment during breaks, reduce operating time $467 - - $467
-
kW-mo/yr
05 2.2625: Chill water to the highest temperature possible $455 - $389
5,866
kWh
$66
-
kW-mo/yr
06 2.4239: Eliminate or reduce compressed air usage $7,962 $2,000 $6,807
102,637
kWh
$1,155
-
kW-mo/yr
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,246 $2,080 $3,483
53,109
kWh
$763
-
kW-mo/yr
08 2.4239: Eliminate or reduce compressed air usage $353 $50 $302
4,584
kWh
$51
-
kW-mo/yr
09 2.4221: Install compressor air intakes in coolest locations $193 $500 $165
2,484
kWh
$28
-
kW-mo/yr
10 2.7142: Utilize higher efficiency lamps and/or ballasts $11,539 $17,808 $9,864
148,739
kWh
$1,675
-
kW-mo/yr
TOTAL RECOMMENDED $98,988 $22,438 $93,699
1,413,462
kWh
$5,289
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs