Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

277

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Flat glass
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AM0573 #01 Y:2010 Add additional production shift $18,420 -
OK0769 #07 Y:2008 Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $451,827 $2,500,000
OK0769 #06 Y:2008 Begin a practice of predictive / preventative maintenance $2,068 $200
OK0769 #05 Y:2008 Use adjustable frequency drive or multiple speed motors on existing system $21,911 $4,475
OK0769 #04 Y:2008 Utilize higher efficiency lamps and/or ballasts $98,641 $246,228
OK0769 #03 Y:2008 Utilize higher efficiency lamps and/or ballasts $788 $1,922
OK0769 #02 Y:2008 Install / repair insulation on steam lines $18,368 $731
OK0769 #01 Y:2008 Install / repair insulation on steam lines $53,558 $2,347
LL0293 #07 Y:2008 Conserve energy by efficient use of vending machines $436 $501
LL0293 #06 Y:2008 Eliminate leaks in inert gas and compressed air lines/ valves $819 $360
LL0293 #05 Y:2008 Install timers on light switches in little used areas $889 $45
LL0293 #04 Y:2008 Use photocell controls $1,073 $60
LL0293 #03 Y:2008 Begin a practice of predictive / preventative maintenance $1,733 $60
LL0293 #02 Y:2008 Insulate bare equipment $3,531 $655
LL0293 #01 Y:2008 Use adjustable frequency drive or multiple speed motors on existing system $37,156 $56,346
IA0407 #07 Y:2007 Eliminate or reduce compressed air usage $5,709 $16,692
IA0407 #06 Y:2007 Use most efficient type of electric motors $1,084 $12,025
IA0407 #05 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $9,366 $1,000
IA0407 #04 Y:2007 Install occupancy sensors $3,657 $4,543
IA0407 #03 Y:2007 Utilize higher efficiency lamps and/or ballasts $25,719 $38,791