ITAC Assessment: OK0769
ITAC logo
ITAC Assessment: OK0769
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Flat Glass
NAICS 327212: Other Pressed and Blown Glass and Glassware Manufacturing
SIC 3211: Flat Glass
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 950,000
ft2
Annual Production 185,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,331,278 43,445,246
kWh
Natural Gas $8,840,369 1,185,394
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $647,161 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,699

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2136: Install / repair insulation on steam lines $53,558 $2,347 - $53,558
-
MMBtu
02 2.2136: Install / repair insulation on steam lines $18,368 $731 $18,368
296,600
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $788 $1,922 $788
13,385
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $98,641 $246,228 $98,641
1,638,865
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $21,911 $4,475 $21,911
408,043
kWh
-
06 4.611: Begin a practice of predictive / preventative maintenance $2,068 $200 $2,068
-
kWh
-
07 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $451,827 $2,500,000 $451,827
8,760,000
kWh
-
TOTAL RECOMMENDED $647,161 $2,755,903 $593,603
11,116,893
kWh
$53,558
-
MMBtu
TOTAL IMPLEMENTED $22,699 $6,397 $22,699
421,428
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs