Assessment Year | 2008 |
---|---|
Principal Product | Flat Glass |
NAICS | 327212: Other Pressed and Blown Glass and Glassware Manufacturing |
SIC | 3211: Flat Glass |
Sales Range | $50 M to 100M |
# of Employees | 250 |
Plant Area |
950,000
ft2
|
Annual Production | 185,000
ton
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,331,278 | 43,445,246 |
kWh
|
$0.054 |
Natural Gas | $8,840,369 | 1,185,394 |
MMBtu
|
$7.46 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $647,161 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $22,699 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2136: Install / repair insulation on steam lines | $53,558 | $2,347 | - |
$53,558
-
MMBtu
|
|
02 | 2.2136: Install / repair insulation on steam lines | $18,368 | $731 |
$18,368
296,600
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $788 | $1,922 |
$788
13,385
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $98,641 | $246,228 |
$98,641
1,638,865
kWh
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $21,911 | $4,475 |
$21,911
408,043
kWh
|
- | |
06 | 4.611: Begin a practice of predictive / preventative maintenance | $2,068 | $200 |
$2,068
-
kWh
|
- | |
07 | 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $451,827 | $2,500,000 |
$451,827
8,760,000
kWh
|
- | |
TOTAL RECOMMENDED | $647,161 | $2,755,903 |
$593,603
11,116,893
kWh
|
$53,558
-
MMBtu
|
||
TOTAL IMPLEMENTED | $22,699 | $6,397 |
$22,699
421,428
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs