Assessment Year | 2010 |
---|---|
Principal Product | Insulated glass window units |
NAICS | 327211: Flat Glass Manufacturing |
SIC | 3211: Flat Glass |
Sales Range | $10 M to 50M |
# of Employees | 89 |
Plant Area |
180,000
ft2
|
Annual Production | 450,000
pieces
|
Production Hrs. Annual | 2,500
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $775,864 | 8,455,934 |
kWh
|
$0.092 |
Electricity Demand | $199,534 | 29,397 |
kW-mo/yr
|
$6.79 |
Electricity Fees | $22,931 | - |
|
- |
Natural Gas | $71,500 | 14,928 |
MMBtu
|
$4.79 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $46,280 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $26,550 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 4.451: Add additional production shift | $18,420 | - |
$(-8,550.0)
(-95,000)
kWh
|
$38,220
-
kW-mo/yr
|
- | - | $(-11,250.0) | - | |
02 | 2.7111: Reduce illumination to minimum necessary levels | $17,800 | $3,915 |
$12,400
137,650
kWh
|
$4,200
-
kW-mo/yr
|
- | - | - | $1,200 | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,360 | $500 |
$4,000
44,390
kWh
|
$1,360
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,750 | $685 |
$390
4,350
kWh
|
$40
-
kW-mo/yr
|
- | - | $1,320 | - | |
05 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $1,370 | - | - | - | - |
$1,370
-
lb
|
- | - | |
06 | 2.8112: Combine utility meters | $1,310 | $1,250 | - |
$810
-
kW-mo/yr
|
$500 | - | - | - | |
07 | 2.7124: Make a practice of turning off lights when not needed | $270 | $105 |
$225
2,500
kWh
|
$45
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $46,280 | $6,455 |
$8,465
93,890
kWh
|
$44,675
-
kW-mo/yr
|
$500 |
$1,370
-
lb
|
$(-9,930.0) | $1,200 | ||
TOTAL IMPLEMENTED | $26,550 | $5,205 |
$17,015
188,890
kWh
|
$5,645
-
kW-mo/yr
|
- |
$1,370
-
lb
|
$1,320 | $1,200 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs